SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsPennsylvaniaPittsburgh
PA-937004

PPA 1STAVE 8-9

600 First Avenue, Pittsburgh, PA, 15219

PPA 1STAVE 8-9 is an EV charging location in Pittsburgh, PA with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • First Avenue Garage - Third Floor

    Source · NREL

Stations & ports

1 station · 2 ports
PPA 1STAVE 8-9 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

600 First Avenue · Pittsburgh, PA · 15219

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PPA 1STAVE 8-9 located?
PPA 1STAVE 8-9 is located at 600 First Avenue, Pittsburgh, PA.
What kind of charging does PPA 1STAVE 8-9 offer?
PPA 1STAVE 8-9 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at PPA 1STAVE 8-9?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at PPA 1STAVE 8-9. Actual times vary with vehicle, temperature, and station load.
What are PPA 1STAVE 8-9's charging hours?
24 hours daily
What charging network operates PPA 1STAVE 8-9?
PPA 1STAVE 8-9 is part of the ChargePoint network. See more ChargePoint charging across PA on SpotCharge.
Can anyone use the chargers at PPA 1STAVE 8-9?
Yes — PPA 1STAVE 8-9 is a publicly accessible charging location.
Is the PPA 1STAVE 8-9 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Pennsylvania · 2024
Plug-in vehicles
138K
#13 in US
Battery-electric
90K
65% of fleet
EVs per public port
23.8
5,780 ports listed

As of 2024, Pennsylvania had 137,500 plug-in vehicles registered — 89,900 fully battery-electric (65%) and 47,600 plug-in hybrid (35%). That ranks Pennsylvania #13 nationally and represents about 2.3% of all US plug-in registrations.

Across 5,780 publicly-listed ports in Pennsylvania (3,202 Level 2 and 2,574 DC fast), that works out to roughly 23.8 EVs per public port and 34.9 BEVs per DC fast port.

Pennsylvania's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Pennsylvania market data →

More charging in Pittsburgh

See all →

Fairfield Inn & Suites Pittsburgh North/McCandless Crossing - Tesla Destination

Pittsburgh, PA

Level 2Tesla Destination
2 stations · 8 ports

UNIV PITTSBURGH PH STATION 2

Pittsburgh, PA

Level 2ChargePoint
1 station · 2 ports6.5 kW

PRODUCETERMINAL STRIP TERM 1

Pittsburgh, PA

Level 2ChargePoint
1 station · 2 ports6.5 kW

AHN Suburban

Pittsburgh, PA

Level 2Blink
1 station · 2 ports6.7 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id387700
zip15219
cityPittsburgh
plus4—
statePA
ng_psi—
cng_psi—
countryUS
latitude40.434992
bd_blends—
longitude-79.996613
open_date2025-03-13
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:56:31Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_namePPA 1STAVE 8-9
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "26970841",
    "26970851"
  ],
  "station": [
    "USCPIL17108821"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address600 First Avenue
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsFirst Avenue Garage - Third Floor
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging