SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsPennsylvaniaPittsburgh
PA-816301

PowerUp Point

1825 Liverpool Street, Pittsburgh, PA, 15233
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Standalone station
📅Open since 2025
🚚Fits Medium-duty (vans, small trucks)
Max power
180 kW
AC Level 2
Ports
6
ports
Hours
24/7
Open 24 hours
Pricing
Varies
Varies

About this location

24/7 access; open surface lot with lighting

Stations & ports

1 station · 6 ports
PowerUp Point
(Unknown Operator)
AC L2 · 180 kW
1ACCS· 180 kW· 500V/900A
1BCCS· 180 kW· 500V/900A
1CCCS· 180 kW· 500V/900A
1DCCS· 180 kW· 500V/900A
1ECCS· 180 kW· 500V/900A
1FCCS· 180 kW· 500V/900A

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1825 Liverpool Street · Pittsburgh, PA · 15233

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PowerUp Point located?
PowerUp Point is located at 1825 Liverpool Street, Pittsburgh, PA.
What kind of charging does PowerUp Point offer?
PowerUp Point offers Level 2 (AC) charging, with stations rated up to 180 kW. There is 1 charging station and 6 total ports at this location.
How long does it take to charge an EV at PowerUp Point?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at PowerUp Point. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at PowerUp Point?
Varies
What are PowerUp Point's charging hours?
Open 24 hours
What charging network operates PowerUp Point?
PowerUp Point is part of the Non-Networked network. See more Non-Networked charging across PA on SpotCharge.
Can anyone use the chargers at PowerUp Point?
Yes — PowerUp Point is a publicly accessible charging location.
Is the PowerUp Point listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap, NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Pennsylvania · 2024
Plug-in vehicles
138K
#13 in US
Battery-electric
90K
65% of fleet
EVs per public port
26.3
5,226 ports listed

As of 2024, Pennsylvania had 137,500 plug-in vehicles registered — 89,900 fully battery-electric (65%) and 47,600 plug-in hybrid (35%). That ranks Pennsylvania #13 nationally and represents about 2.3% of all US plug-in registrations.

Across 5,226 publicly-listed ports in Pennsylvania (2,931 Level 2 and 2,291 DC fast), that works out to roughly 26.3 EVs per public port and 39.2 BEVs per DC fast port.

Pennsylvania's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Pennsylvania market data →

More charging in Pittsburgh

See all →

AHN Suburban

Pittsburgh, PA

Level 2Blink Network
1 station · 2 ports7.2 kW

Electric Era Charging Station

Pittsburgh, PA

DC FastELECTRIC_ERA
1 station · 4 ports50 kW

West General Robinson Street Garage

Pittsburgh, PA

Level 2VIALYNK
1 station · 8 ports7.2 kW

Mosaic Apartments

Pittsburgh, PA

Level 2CHARGELAB
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Pricing
Varies
Network
Non-Networked
Access
Public access

Verified by NREL · 10 months ago

Data from OpenChargeMap, NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id398079
zip15233
cityPittsburgh
plus4—
statePA
ng_psi—
cng_psi—
countryUS
latitude40.45348
bd_blends—
longitude-80.0326
open_date2025-05-30
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_namePowerUp Point
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeSTANDALONE_STATION
nps_unit_name—
station_phone—
cards_acceptedA APPLE_PAY CREDIT D Debit M V
ev_dc_fast_num6
ev_network_web—
fuel_type_codeELEC
geocode_status200-8
hy_status_link—
street_address1825 Liverpool St
funding_sources—
owner_type_codeP
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2025-08-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classMD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
OpenChargeMap15 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID313516
UUID5850C3B6-8434-4BC1-B93A-99389C0EBDE8
UsageCostVaries
OperatorID1
AddressInfo
{
  "ID": 313905,
  "Town": "Pittsburgh",
  "Title": "PowerUp Point",
  "Latitude": 40.45338305065712,
  "Postcode": "15233",
  "CountryID": 2,
  "Longitude": -80.03230008101752,
  "RelatedURL": "https://www.poweruppoint.energy/",
  "AddressLine1": "1825 Liverpool Street",
  "DistanceUnit": 0,
  "AccessComments": "24/7 access; open surface lot with lighting",
  "StateOrProvince": "PA",
  "ContactTelephone1": "202-650-0858",
  "ContactTelephone2": "410-991-7696"
}
Connections
[
  {
    "ID": 603801,
    "Amps": 900,
    "LevelID": 2,
    "PowerKW": 180,
    "Voltage": 500,
    "Comments": "Operated by Inspiration Mobility; opening late July 2025",
    "Quantity": 6,
    "StatusTypeID": 150,
    "CurrentTypeID": 10,
    "ConnectionTypeID": 32
  }
]
DateCreated2025-06-10T14:54:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 1,
  "Title": "(Unknown Operator)",
  "Comments": null,
  "BookingURL": null,
  "WebsiteURL": null,
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": null,
  "IsPrivateIndividual": null,
  "PhonePrimaryContact": null,
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
NumberOfPoints6
DateLastVerified2025-06-13T14:59:00Z
DateLastStatusUpdate2025-06-13T14:59:00Z
SubmissionStatusTypeID200
SpotCharge · Data via OpenChargeMap