SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
ยฉ 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonIndependence
OR-900664

RIVERPLACE RIVERPLACE APT

295 Deann Drive, Independence, OR, 97351

RIVERPLACE RIVERPLACE APT is an EV charging location in Independence, OR with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
๐ŸŒImported from open data
๐Ÿ“…Open since 2015
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
โ€”

Finding this location

  • Entrance of Apts right by Car Wash Station

    Source ยท NREL

Stations & ports

1 station ยท 2 ports
RIVERPLACE RIVERPLACE APT ยท L2 J1772 6.5 kW
ChargePoint Network
AC L2 ยท 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network โ†’
1AJ1772ยท 6.5 kW
1BJ1772ยท 6.5 kW

Estimated charging time

Level 2 (AC) ยท 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV โ†’

295 Deann Drive ยท Independence, OR ยท 97351

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet โ€” be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is RIVERPLACE RIVERPLACE APT located?
RIVERPLACE RIVERPLACE APT is located at 295 Deann Drive, Independence, OR.
What kind of charging does RIVERPLACE RIVERPLACE APT offer?
RIVERPLACE RIVERPLACE APT offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at RIVERPLACE RIVERPLACE APT?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at RIVERPLACE RIVERPLACE APT. Actual times vary with vehicle, temperature, and station load.
What are RIVERPLACE RIVERPLACE APT's charging hours?
24 hours daily
What charging network operates RIVERPLACE RIVERPLACE APT?
RIVERPLACE RIVERPLACE APT is part of the ChargePoint network. See more ChargePoint charging across OR on SpotCharge.
Can anyone use the chargers at RIVERPLACE RIVERPLACE APT?
Yes โ€” RIVERPLACE RIVERPLACE APT is a publicly accessible charging location.
Is the RIVERPLACE RIVERPLACE APT listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon ยท 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
25.8
4,328 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered โ€” 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,328 publicly-listed ports in Oregon (2,529 Level 2 and 1,787 DC fast), that works out to roughly 25.8 EVs per public port and 43.9 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption โ€” but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) ยท See full Oregon market data โ†’

More charging in Independence

See all โ†’

Independence - North Osprey Lane Parking Lot

Independence, OR

Level 2Blink
1 station ยท 2 ports8.6 kW

INDPNDNCE HOTEL STATION 2

Independence, OR

Level 2ChargePoint
1 station ยท 2 ports6.5 kW

City of Independence - North Parking

Independence, OR

Level 2Blink
1 station ยท 2 ports8.6 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint โ†—
Access
Public access

Verified by NREL ยท 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fieldsโ–พ

From U.S. DOE AFDC ยท Public domain

id67164
zip97351
cityIndependence
plus4โ€”
stateOR
ng_psiโ€”
cng_psiโ€”
countryUS
latitude44.865232
bd_blendsโ€”
longitude-123.183309
open_date2015-05-20
rd_blendsโ€”
ev_networkChargePoint Network
ev_pricingโ€”
updated_at2026-09-15T01:00:36Z
access_codepublic
cng_has_rngโ€”
lng_has_rngโ€”
lpg_primaryโ€”
status_codeE
bd_blends_frโ€”
hy_is_retailโ€”
hy_pressuresโ€”
hy_standardsโ€”
rd_blends_frโ€”
station_nameRIVERPLACE RIVERPLACE APT
ev_other_evseโ€”
ev_pricing_frโ€”
expected_dateโ€”
facility_typeโ€”
nps_unit_nameโ€”
station_phone888-758-4389
cards_acceptedโ€”
ev_dc_fast_numโ€”
ev_network_ids
{
  "posts": [
    "10832201",
    "10832211"
  ],
  "station": [
    "USCPIL117629"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_linkโ€”
street_address295 Deann Drive
funding_sourcesโ€”
owner_type_codeโ€”
access_days_time24 hours daily
e85_blender_pumpโ€”
lpg_nozzle_typesโ€”
ng_vehicle_classโ€”
related_stationsโ€”
cng_dispenser_numโ€”
cng_total_storageโ€”
cng_vehicle_classโ€”
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_classโ€”
ng_fill_type_codeโ€”
restricted_accessNo
access_detail_codeโ€”
cng_fill_type_codeโ€”
ev_connector_typesJ1772
ev_level1_evse_numโ€”
ev_level2_evse_num2
access_days_time_frโ€”
date_last_confirmed2026-09-15
ev_renewable_sourceโ€”
cng_renewable_sourceโ€”
lng_renewable_sourceโ€”
cng_total_compressionโ€”
ev_workplace_chargingNo
maximum_vehicle_classโ€”
rd_max_biodiesel_levelโ€”
groups_with_access_codePublic
intersection_directionsEntrance of Apts right by Car Wash Station
e85_other_ethanol_blendsโ€”
rd_blended_with_biodieselโ€”
groups_with_access_code_frPublic
intersection_directions_frโ€”
SpotCharge ยท Owner-listed EV charging