SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonMedford
OR-898525

Airport Chevrolet GMC Cadillac

3001 Biddle Rd, Medford, OR, 97504

Airport Chevrolet GMC Cadillac is an EV charging location in Medford, OR with 2 DC fast and Level 2 charging ports up to 50 kW on the EV Connect network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
50 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
Airport Chevrolet GMC Cadillac · DCFC CCS 50 kW
EV Connect
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on EV Connect network →
1ACCS· 50 kW
Airport Chevrolet GMC Cadillac · L2 J1772 19.2 kW
EV Connect
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on EV Connect network →
2AJ1772· 19.2 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3001 Biddle Rd · Medford, OR · 97504

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Airport Chevrolet GMC Cadillac located?
Airport Chevrolet GMC Cadillac is located at 3001 Biddle Rd, Medford, OR.
What kind of charging does Airport Chevrolet GMC Cadillac offer?
Airport Chevrolet GMC Cadillac offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at Airport Chevrolet GMC Cadillac?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 5 h 18 min on 11 kW Level 2 (AC) charging at Airport Chevrolet GMC Cadillac. Actual times vary with vehicle, temperature, and station load.
What are Airport Chevrolet GMC Cadillac's charging hours?
24 hours daily
What charging network operates Airport Chevrolet GMC Cadillac?
Airport Chevrolet GMC Cadillac is part of the EV Connect network. See more EV Connect charging across OR on SpotCharge.
Can anyone use the chargers at Airport Chevrolet GMC Cadillac?
Yes — Airport Chevrolet GMC Cadillac is a publicly accessible charging location.
Is the Airport Chevrolet GMC Cadillac listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
25.8
4,328 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,328 publicly-listed ports in Oregon (2,529 Level 2 and 1,787 DC fast), that works out to roughly 25.8 EVs per public port and 43.9 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More DC fast charging

DC fast charging in Medford →DC fast charging in Oregon →EV Connect in Oregon →

More charging in Medford

See all →

Medford, OR Rechargery Relay - S Riverside Ave

Medford, OR

DC FastIONNA
2 stations · 12 ports400 kW

LITHIA CJ MEDFO DC-EXPP-PL-1

Medford, OR

DC FastChargePoint
1 station · 2 ports200 kW

LITHIA CJ MEDFO L2-CP6K-1

Medford, OR

Level 2ChargePoint
1 station · 2 ports19.2 kW

Buffalo Wild Wings - Tesla Supercharger

Medford, OR

DC FastTesla
1 station · 9 ports
Details
Hours
24 hours daily
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id330518
zip97504
cityMedford
plus4—
stateOR
ng_psi—
cng_psi—
countryUS
latitude42.360926
bd_blends—
longitude-122.876573
open_date2024-03-14
rd_blends—
ev_networkEV Connect
ev_pricing—
updated_at2026-09-18T03:58:26Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameAirport Chevrolet GMC Cadillac
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone866-816-7584
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "63a33509a3f023689a8426d2",
    "6567722b3fd7e94a61f3533a"
  ],
  "station": [
    "5731e5e9-a903-437f-91a6-e3b56560ed0a"
  ]
}
ev_network_webhttps://www.evconnect.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address3001 Biddle Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging