SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonSherwood
OR-773233

Willamette Water Supply System Water Treatment Plant

21309 Southwest 124th Avenue, Sherwood, OR, 97140

Willamette Water Supply System Water Treatment Plant is an EV charging location in Sherwood, OR with 2 Level 2 charging ports up to 10 kW on the Blink network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
10.4 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
Willamette Water Supply System Water Treatment Plant · L2 J1772 10.4 kW
Blink Network
AC L2 · 10.4 kW

10.4 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on Blink Network network →
1AJ1772· 10.4 kW
1BJ1772· 10.4 kW

Estimated charging time

Level 2 (AC) · 10.4 kW
~5 h 37 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

21309 Southwest 124th Avenue · Sherwood, OR · 97140

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Willamette Water Supply System Water Treatment Plant located?
Willamette Water Supply System Water Treatment Plant is located at 21309 Southwest 124th Avenue, Sherwood, OR.
What kind of charging does Willamette Water Supply System Water Treatment Plant offer?
Willamette Water Supply System Water Treatment Plant offers Level 2 (AC) charging, with stations rated up to 10.4 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Willamette Water Supply System Water Treatment Plant?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 37 min on 10.4 kW Level 2 (AC) charging at Willamette Water Supply System Water Treatment Plant. Actual times vary with vehicle, temperature, and station load.
What are Willamette Water Supply System Water Treatment Plant's charging hours?
24 hours daily
What charging network operates Willamette Water Supply System Water Treatment Plant?
Willamette Water Supply System Water Treatment Plant is part of the Blink network. See more Blink charging across OR on SpotCharge.
Can anyone use the chargers at Willamette Water Supply System Water Treatment Plant?
Yes — Willamette Water Supply System Water Treatment Plant is a publicly accessible charging location.
Is the Willamette Water Supply System Water Treatment Plant listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
25.2
4,423 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,423 publicly-listed ports in Oregon (2,574 Level 2 and 1,837 DC fast), that works out to roughly 25.2 EVs per public port and 42.7 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Sherwood

See all →

Ponzi Vineyards

Sherwood, OR

Level 2OpConnect
1 station · 8 ports7.7 kW

SHERWOOD CITY HALL

Sherwood, OR

Level 2ChargePoint
1 station · 2 ports6.5 kW

Blakeslee Vineyard Estate

Sherwood, OR

Level 2
1 station · 1 port

ACKERLYSH STATION 1

Sherwood, OR

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-998-2546
Network
Blink ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id472178
zip97140
citySherwood
plus4—
stateOR
ng_psi—
cng_psi—
countryUS
latitude45.3640546708886
bd_blends—
longitude-122.8081727153853
open_date2026-10-29
rd_blends—
ev_networkBlink Network
ev_pricing—
unverifiedNo
updated_at2026-11-03T00:55:52Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWillamette Water Supply System Water Treatment Plant
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-998-2546
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "05a77dc5-2bc8-4756-8d10-d6bb431650c1",
    "bf9702ef-06ce-4917-a2af-a5654c78843e"
  ],
  "station": [
    "ecb3cf2c-cb94-485d-991f-28c89e3dbf13"
  ]
}
ev_network_webhttps://blinkcharging.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address21309 Southwest 124th Avenue
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Blink Network",
    "connectors": {
      "J1772": {
        "power_kw": 10.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Blink Network",
    "connectors": {
      "J1772": {
        "power_kw": 10.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-11-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging