SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonEugene
OR-731937

UO-EMU LOT 29A

1395 University St, Eugene, OR, 97403
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
UO-EMU LOT 29A · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1395 University St · Eugene, OR · 97403

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is UO-EMU LOT 29A located?
UO-EMU LOT 29A is located at 1395 University St, Eugene, OR.
What kind of charging does UO-EMU LOT 29A offer?
UO-EMU LOT 29A offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at UO-EMU LOT 29A?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at UO-EMU LOT 29A. Actual times vary with vehicle, temperature, and station load.
What are UO-EMU LOT 29A's charging hours?
Open 24 hours
What charging network operates UO-EMU LOT 29A?
UO-EMU LOT 29A is part of the ChargePoint Network network. See more ChargePoint Network charging across OR on SpotCharge.
Can anyone use the chargers at UO-EMU LOT 29A?
Yes — UO-EMU LOT 29A is a publicly accessible charging location.
Is the UO-EMU LOT 29A listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
27.1
4,122 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,122 publicly-listed ports in Oregon (2,435 Level 2 and 1,675 DC fast), that works out to roughly 27.1 EVs per public port and 46.8 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Eugene

See all →

COURTYARD EUG COURTYARD EUG 1

Eugene, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

UO-EMU MILLRACE #1

Eugene, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

UO-EMU 1715 FRANKLIIN

Eugene, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

UO-EMU 12B #1

Eugene, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging