SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonEugene
OR-694175

L059 EV 2

2121 Martin Luther King Jr Blvd, Eugene, OR, 97401

L059 EV 2 is an EV charging location in Eugene, OR with 2 Level 2 charging ports up to 19 kW on the ChargePoint network. Mon: 8:00am-6:00pm; Tue: 8:00am-6:00pm; Wed: 8:00am-6:00pm; Thu: 8:00am-6:00pm; Fri: 8:00am-6:00pm; Sat: 8:00am-6:00pm; Sun: 8:00am-6:00pm. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
Hours
Mon: 8:00am-6:00pm; Tue: 8:00am-6:00pm; Wed: 8:00am-6:00pm; Thu: 8:00am-6:00pm; Fri: 8:00am-6:00pm; Sat: 8:00am-6:00pm; Sun: 8:00am-6:00pm
Pricing
—

Finding this location

  • This charger is on the west side of the building.

    Source · NREL

Stations & ports

1 station · 2 ports
L059 EV 2 · L2 J1772 19.2 kW
ChargePoint Network
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2121 Martin Luther King Jr Blvd · Eugene, OR · 97401

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is L059 EV 2 located?
L059 EV 2 is located at 2121 Martin Luther King Jr Blvd, Eugene, OR.
What kind of charging does L059 EV 2 offer?
L059 EV 2 offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at L059 EV 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at L059 EV 2. Actual times vary with vehicle, temperature, and station load.
What are L059 EV 2's charging hours?
Mon: 8:00am-6:00pm; Tue: 8:00am-6:00pm; Wed: 8:00am-6:00pm; Thu: 8:00am-6:00pm; Fri: 8:00am-6:00pm; Sat: 8:00am-6:00pm; Sun: 8:00am-6:00pm
What charging network operates L059 EV 2?
L059 EV 2 is part of the ChargePoint network. See more ChargePoint charging across OR on SpotCharge.
Can anyone use the chargers at L059 EV 2?
Yes — L059 EV 2 is a publicly accessible charging location.
Is the L059 EV 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
25.8
4,328 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,328 publicly-listed ports in Oregon (2,529 Level 2 and 1,787 DC fast), that works out to roughly 25.8 EVs per public port and 43.9 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Eugene

See all →

New Hope Christian College - Tesla Destination

Eugene, OR

Level 2Tesla Destination
1 station · 2 ports10 kW

WinCo Foods - Tesla Supercharger

Eugene, OR

DC FastTesla
1 station · 12 ports325 kW

COURTYARD EUG COURTYARD EUG 1

Eugene, OR

Level 2ChargePoint
1 station · 2 ports9.6 kW

UO-EMU MILLRACE #1

Eugene, OR

Level 2ChargePoint
1 station · 2 ports7.7 kW
Details
Hours
Mon: 8:00am-6:00pm; Tue: 8:00am-6:00pm; Wed: 8:00am-6:00pm; Thu: 8:00am-6:00pm; Fri: 8:00am-6:00pm; Sat: 8:00am-6:00pm; Sun: 8:00am-6:00pm
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id323309
zip97401
cityEugene
plus4—
stateOR
ng_psi—
cng_psi—
countryUS
latitude44.060245
bd_blends—
longitude-123.079278
open_date2023-12-22
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:33:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameL059 EV 2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "23725931",
    "23725941"
  ],
  "station": [
    "USCPIL14234251"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2121 Martin Luther King Jr Blvd
funding_sources—
owner_type_code—
access_days_timeMon: 8:00am-6:00pm; Tue: 8:00am-6:00pm; Wed: 8:00am-6:00pm; Thu: 8:00am-6:00pm; Fri: 8:00am-6:00pm; Sat: 8:00am-6:00pm; Sun: 8:00am-6:00pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsThis charger is on the west side of the building.
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging