SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonEnterprise
OR-434495

Wallowa County Planning Department

101 S. River Street,, Enterprise, OR, 97828
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Wallowa County Planning Department · L2 J1772
Blink Network
AC L2 · 7.2 kW
Start session on Blink Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

101 S. River Street, · Enterprise, OR · 97828

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Wallowa County Planning Department located?
Wallowa County Planning Department is located at 101 S. River Street,, Enterprise, OR.
What kind of charging does Wallowa County Planning Department offer?
Wallowa County Planning Department offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Wallowa County Planning Department?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Wallowa County Planning Department. Actual times vary with vehicle, temperature, and station load.
What are Wallowa County Planning Department's charging hours?
Open 24 hours
What charging network operates Wallowa County Planning Department?
Wallowa County Planning Department is part of the Blink Network network. See more Blink Network charging across OR on SpotCharge.
Can anyone use the chargers at Wallowa County Planning Department?
Yes — Wallowa County Planning Department is a publicly accessible charging location.
Is the Wallowa County Planning Department listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
27.1
4,122 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,122 publicly-listed ports in Oregon (2,435 Level 2 and 1,675 DC fast), that works out to roughly 27.1 EVs per public port and 46.8 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Enterprise

See all →

ENTERPRISE ELEC STATION 1

Enterprise, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

WR EV STATION WR EV STATION

Enterprise, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-998-2546
Network
Blink Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging