SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonTroutdale
OR-399479

EDGEWOOD APTS EASTWOOD 5

1323 Southwest Cherry Park Road, Troutdale, OR, 97060

EDGEWOOD APTS EASTWOOD 5 is an EV charging location in Troutdale, OR with 1 Level 2 charging port up to 12 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
12 kW
AC Level 2
Ports
1
port
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 1 port
EDGEWOOD APTS EASTWOOD 5 · L2 J1772 12 kW
ChargePoint Network
AC L2 · 12 kW

12 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 12 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1323 Southwest Cherry Park Road · Troutdale, OR · 97060

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is EDGEWOOD APTS EASTWOOD 5 located?
EDGEWOOD APTS EASTWOOD 5 is located at 1323 Southwest Cherry Park Road, Troutdale, OR.
What kind of charging does EDGEWOOD APTS EASTWOOD 5 offer?
EDGEWOOD APTS EASTWOOD 5 offers Level 2 (AC) charging, with stations rated up to 12 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at EDGEWOOD APTS EASTWOOD 5?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at EDGEWOOD APTS EASTWOOD 5. Actual times vary with vehicle, temperature, and station load.
What are EDGEWOOD APTS EASTWOOD 5's charging hours?
24 hours daily
What charging network operates EDGEWOOD APTS EASTWOOD 5?
EDGEWOOD APTS EASTWOOD 5 is part of the ChargePoint network. See more ChargePoint charging across OR on SpotCharge.
Can anyone use the chargers at EDGEWOOD APTS EASTWOOD 5?
Yes — EDGEWOOD APTS EASTWOOD 5 is a publicly accessible charging location.
Is the EDGEWOOD APTS EASTWOOD 5 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
25.8
4,320 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,320 publicly-listed ports in Oregon (2,529 Level 2 and 1,779 DC fast), that works out to roughly 25.8 EVs per public port and 44.1 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Troutdale

See all →

MOUNTAIN MEADOW CHARGER 10

Troutdale, OR

Level 2ChargePoint
1 station · 1 port7.7 kW

North Downtown Parking Lot

Troutdale, OR

Level 2FLO
1 station · 2 ports6.2 kW

Mayors Square Parking Lot

Troutdale, OR

Level 2FLO
1 station · 2 ports7.2 kW

Springdale JCC

Troutdale, OR

Level 2
1 station · 5 ports
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id449013
zip97060
cityTroutdale
plus4—
stateOR
ng_psi—
cng_psi—
countryUS
latitude45.530305
bd_blends—
longitude-122.401268
open_date2026-01-08
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:08:14Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEDGEWOOD APTS EASTWOOD 5
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "28674261"
  ],
  "station": [
    "USCPIL18482911"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1323 Southwest Cherry Park Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 12,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging