SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonAlbany
OR-313805

LINN COUNTY COURTHOUSE LOT

315 SE 4th Ave, Albany, OR, 97321
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
LINN COUNTY COURTHOUSE LOT · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

315 SE 4th Ave · Albany, OR · 97321

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is LINN COUNTY COURTHOUSE LOT located?
LINN COUNTY COURTHOUSE LOT is located at 315 SE 4th Ave, Albany, OR.
What kind of charging does LINN COUNTY COURTHOUSE LOT offer?
LINN COUNTY COURTHOUSE LOT offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at LINN COUNTY COURTHOUSE LOT?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at LINN COUNTY COURTHOUSE LOT. Actual times vary with vehicle, temperature, and station load.
What are LINN COUNTY COURTHOUSE LOT's charging hours?
Open 24 hours
What charging network operates LINN COUNTY COURTHOUSE LOT?
LINN COUNTY COURTHOUSE LOT is part of the ChargePoint Network network. See more ChargePoint Network charging across OR on SpotCharge.
Can anyone use the chargers at LINN COUNTY COURTHOUSE LOT?
Yes — LINN COUNTY COURTHOUSE LOT is a publicly accessible charging location.
Is the LINN COUNTY COURTHOUSE LOT listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
27.1
4,122 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,122 publicly-listed ports in Oregon (2,435 Level 2 and 1,675 DC fast), that works out to roughly 27.1 EVs per public port and 46.8 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Albany

See all →

CM APARTMENTS CM-E

Albany, OR

Level 2ChargePoint Network
1 station · 1 port7.2 kW

ALBANY YMCA STATION 1

Albany, OR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

HYUNDAI CHARGER HYUNDAI EV 2

Albany, OR

DC FastChargePoint Network
2 stations · 2 ports50 kW

HYUNDAI EV 1 HYUNDAI #1

Albany, OR

DC FastChargePoint Network
2 stations · 2 ports50 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging