SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonTigard
OR-252718

PGE LINCOLN DCFC 1

10350 Southwest Greenburg Road, Tigard, OR, 97223

PGE LINCOLN DCFC 1 is an EV charging location in Tigard, OR with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Parking lot between Red Lobster and Margarita Factory

    Source · NREL

Stations & ports

2 stations · 2 ports
PGE LINCOLN DCFC 1 · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
PGE LINCOLN DCFC 1 · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

10350 Southwest Greenburg Road · Tigard, OR · 97223

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PGE LINCOLN DCFC 1 located?
PGE LINCOLN DCFC 1 is located at 10350 Southwest Greenburg Road, Tigard, OR.
What kind of charging does PGE LINCOLN DCFC 1 offer?
PGE LINCOLN DCFC 1 offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at PGE LINCOLN DCFC 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at PGE LINCOLN DCFC 1. Actual times vary with vehicle, temperature, and station load.
What are PGE LINCOLN DCFC 1's charging hours?
24 hours daily
What charging network operates PGE LINCOLN DCFC 1?
PGE LINCOLN DCFC 1 is part of the ChargePoint network. See more ChargePoint charging across OR on SpotCharge.
Can anyone use the chargers at PGE LINCOLN DCFC 1?
Yes — PGE LINCOLN DCFC 1 is a publicly accessible charging location.
Is the PGE LINCOLN DCFC 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
25.8
4,328 ports listed

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Across 4,328 publicly-listed ports in Oregon (2,529 Level 2 and 1,787 DC fast), that works out to roughly 25.8 EVs per public port and 43.9 BEVs per DC fast port.

Oregon's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More DC fast charging

DC fast charging in Tigard →DC fast charging in Oregon →ChargePoint in Oregon →

More charging in Tigard

See all →

12505 SW North Dakota

Tigard, OR

Level 2Autel
1 station · 12 ports11.5 kW

Tigard Public Library

Tigard, OR

Level 2OpConnect
1 station · 2 ports11.5 kW

BW PLACE 1-6 BOARDWALK PL 1A

Tigard, OR

Level 2ChargePoint
1 station · 1 port7.7 kW

COURTYARD M T CHARLIE

Tigard, OR

Level 2ChargePoint
1 station · 2 ports19.2 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id323145
zip97223
cityTigard
plus4—
stateOR
ng_psi—
cng_psi—
countryUS
latitude45.445071
bd_blends—
longitude-122.775987
open_date2023-12-21
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:35:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_namePGE LINCOLN DCFC 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "24787211"
  ],
  "station": [
    "USCPIL15263031"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address10350 Southwest Greenburg Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsParking lot between Red Lobster and Margarita Factory
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging