SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonHood River
OR-075438

The Fruit Company

2850 Van Horn Drive, Hood River, OR, 97031

The Fruit Company is an EV charging location in Hood River, OR with 2 Level 2 charging ports on the ZEFNET network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Public access. Listing data from NREL, last confirmed June 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
The Fruit Company · L2 J1772
ZEFNET
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on ZEFNET network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2850 Van Horn Drive · Hood River, OR · 97031

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is The Fruit Company located?
The Fruit Company is located at 2850 Van Horn Drive, Hood River, OR.
What kind of charging does The Fruit Company offer?
The Fruit Company offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at The Fruit Company?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at The Fruit Company. Actual times vary with vehicle, temperature, and station load.
What charging network operates The Fruit Company?
The Fruit Company is part of the ZEFNET network. See more ZEFNET charging across OR on SpotCharge.
Can anyone use the chargers at The Fruit Company?
Yes — The Fruit Company is a publicly accessible charging location.
Is the The Fruit Company listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
—
no port data

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Every EV registered in Oregon is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More charging in Hood River

See all →

Hood River Valley Adult Center

Hood RIVER, OR

Level 2FLO
1 station · 4 ports7.2 kW

Gorge White House

Hood River, OR

Level 2ZEFNET
1 station · 2 ports

Mt. Hood Winery

Hood River, OR

Level 2ZEFNET
1 station · 2 ports

Hood River Fire Department

Hood River, OR

Level 2OpConnect
1 station · 1 port9.6 kW
Details
Phone
888-493-3638
Network
ZEFNET ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging