SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOregonWilsonville
OR-004039

PGE WEA DCFC 1

8200 Southwest Wilsonville Road, Wilsonville, OR, 97070

PGE WEA DCFC 1 is an EV charging location in Wilsonville, OR with 2 DC fast charging ports up to 160 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
160 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
PGE WEA DCFC 1 · DCFC CCS 160 kW
ChargePoint Network
DC fast · 160 kW

160 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 160 kW
PGE WEA DCFC 1 · DCFC CHAdeMO 160 kW
ChargePoint Network
DC fast · 160 kW

160 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACHAdeMO· 160 kW

Estimated charging time

DC fast charging · 160 kW
~22 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

8200 Southwest Wilsonville Road · Wilsonville, OR · 97070

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PGE WEA DCFC 1 located?
PGE WEA DCFC 1 is located at 8200 Southwest Wilsonville Road, Wilsonville, OR.
What kind of charging does PGE WEA DCFC 1 offer?
PGE WEA DCFC 1 offers DC fast charging, with stations rated up to 160 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at PGE WEA DCFC 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 22 min on 160 kW DC fast charging at PGE WEA DCFC 1. Actual times vary with vehicle, temperature, and station load.
What are PGE WEA DCFC 1's charging hours?
24 hours daily
What charging network operates PGE WEA DCFC 1?
PGE WEA DCFC 1 is part of the ChargePoint network. See more ChargePoint charging across OR on SpotCharge.
Can anyone use the chargers at PGE WEA DCFC 1?
Yes — PGE WEA DCFC 1 is a publicly accessible charging location.
Is the PGE WEA DCFC 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oregon · 2024
Plug-in vehicles
112K
#16 in US
Battery-electric
78K
70% of fleet
EVs per public port
—
no port data

As of 2024, Oregon had 111,600 plug-in vehicles registered — 78,400 fully battery-electric (70%) and 33,200 plug-in hybrid (30%). That ranks Oregon #16 nationally and represents about 1.9% of all US plug-in registrations.

Every EV registered in Oregon is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Oregon market data →

More DC fast charging

DC fast charging in Wilsonville →DC fast charging in Oregon →ChargePoint in Oregon →

More charging in Wilsonville

See all →

Store No - 701-00516 - 30300 sw Boones Ferry Road

Wilsonville, OR

Level 2Blink
1 station · 2 ports6.7 kW

PGE WEA L2

Wilsonville, OR

Level 2ChargePoint
1 station · 2 ports6.5 kW

OREGON TECH EV STATION 1

Wilsonville, OR

Level 2ChargePoint
1 station · 2 ports9.6 kW

Wilsonville Public Works

Wilsonville, OR

Level 2evGateway
1 station · 2 ports9.6 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id371752
zip97070
cityWilsonville
plus4—
stateOR
ng_psi—
cng_psi—
countryUS
latitude45.302682
bd_blends—
longitude-122.760717
open_date2024-11-21
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:51:40Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_namePGE WEA DCFC 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "26471501"
  ],
  "station": [
    "USCPIL16678031"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address8200 Southwest Wilsonville Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 160,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 160,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging