SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOklahomaTulsa
OK-772187

Bill Knight Ford Tulsa

9607 S Memorial Dr, Tulsa, OK, 74133
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
12
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

3 stations · 12 ports
Bill Knight Ford Tulsa · DCFC CHAdeMO
FCN
DC fast · 50 kW
Start session on FCN network →
1ACHAdeMO· 50 kW· 480V/100A
1BCHAdeMO· 50 kW· 480V/100A
1CCHAdeMO· 50 kW· 480V/100A
Bill Knight Ford Tulsa · L2 J1772
FCN
AC L2 · 7.2 kW
Start session on FCN network →
2AJ1772· 7.2 kW· 240V/30A
2BJ1772· 7.2 kW· 240V/30A
2CJ1772· 7.2 kW· 240V/30A
2DJ1772· 7.2 kW· 240V/30A
2EJ1772· 7.2 kW· 240V/30A
2FJ1772· 7.2 kW· 240V/30A
Bill Knight Ford Tulsa · DCFC CCS
FCN
DC fast · 50 kW
Start session on FCN network →
3ACCS· 50 kW· 480V/100A
3BCCS· 50 kW· 480V/100A
3CCCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

9607 S Memorial Dr · Tulsa, OK · 74133

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Bill Knight Ford Tulsa located?
Bill Knight Ford Tulsa is located at 9607 S Memorial Dr, Tulsa, OK.
What kind of charging does Bill Knight Ford Tulsa offer?
Bill Knight Ford Tulsa offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 3 charging stations and 12 total ports at this location.
How long does it take to charge an EV at Bill Knight Ford Tulsa?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Bill Knight Ford Tulsa. Actual times vary with vehicle, temperature, and station load.
What are Bill Knight Ford Tulsa's charging hours?
Open 24 hours
What charging network operates Bill Knight Ford Tulsa?
Bill Knight Ford Tulsa is part of the FCN network. See more FCN charging across OK on SpotCharge.
Can anyone use the chargers at Bill Knight Ford Tulsa?
Yes — Bill Knight Ford Tulsa is a publicly accessible charging location.
Is the Bill Knight Ford Tulsa listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oklahoma · 2024
Plug-in vehicles
57K
#23 in US
Battery-electric
23K
40% of fleet
EVs per public port
25.8
2,204 ports listed

As of 2024, Oklahoma had 56,900 plug-in vehicles registered — 22,600 fully battery-electric (40%) and 34,300 plug-in hybrid (60%). That ranks Oklahoma #23 nationally and represents about 0.9% of all US plug-in registrations.

Across 2,204 publicly-listed ports in Oklahoma (611 Level 2 and 1,593 DC fast), that works out to roughly 25.8 EVs per public port and 14.2 BEVs per DC fast port.

Oklahoma's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oklahoma market data →

More charging in Tulsa

See all →

East Virgin Ct - Tesla Supercharger (Solsource)

Tulsa, OK

DC FastTesla
2 stations · 4 ports50 kW

VISN 19/Tulsa VAMC (623BY01)_Mobile

Tulsa, OK

Level 2Non-Networked
1 station · 4 ports7.2 kW

TULSA OK SDC

Tulsa, OK

Level 2Non-Networked
1 station · 32 ports7.2 kW

SWPA HQ

Tulsa, OK

Level 2Non-Networked
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
800-489-1588
Network
FCN ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging