ChargePoint is an EV charging location in OK with 2 Level 2 charging ports on the ChargePoint network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Public access. Listing data from OpenStreetMap, last confirmed October 2026.
Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Oklahoma had 56,900 plug-in vehicles registered — 22,600 fully battery-electric (40%) and 34,300 plug-in hybrid (60%). That ranks Oklahoma #23 nationally and represents about 0.9% of all US plug-in registrations.
Across 3,014 publicly-listed ports in Oklahoma (783 Level 2 and 2,231 DC fast), that works out to roughly 18.9 EVs per public port and 10.1 BEVs per DC fast port.
Oklahoma has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Oklahoma drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full Oklahoma market data →