SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOklahomaDavis
OK-539371

Phillips 66 A&W - Tesla Supercharger (Francis Energy)

12253 State Highway 7, Davis, OK, 73030

Phillips 66 A&W - Tesla Supercharger (Francis Energy) is a gas station in Davis, OK with 4 DC fast charging ports on the Tesla network. Charging power is not listed for this location; Tesla sites are typically 150 to 250 kW, which can add 100 miles or more in 15 to 25 minutes, depending on the car. Pricing: $0.44 per kWh. Public access. Listing data from NREL, last confirmed April 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
⛽Gas station
Max power
—
DC fast
Ports
4
ports
Hours
—
Pricing
$0.44 per kWh
$0.44 per kWh

Stations & ports

2 stations · 4 ports
Phillips 66 A&W - Tesla Supercharger (Francis Energy) · DCFC Tesla
Tesla
DC fast

Rating not listed. Tesla sites are typically 150 to 250 kW. That can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on Tesla network →
1ATesla
1BTesla
Phillips 66 A&W - Tesla Supercharger (Francis Energy) · DCFC CCS
Tesla
DC fast

Rating not listed. Tesla sites are typically 150 to 250 kW. That can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on Tesla network →
2ACCS
2BCCS

Estimated charging time

DC fast charging · typical 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

12253 State Highway 7 · Davis, OK · 73030

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Phillips 66 A&W - Tesla Supercharger (Francis Energy) located?
Phillips 66 A&W - Tesla Supercharger (Francis Energy) is located at 12253 State Highway 7, Davis, OK.
What kind of charging does Phillips 66 A&W - Tesla Supercharger (Francis Energy) offer?
Phillips 66 A&W - Tesla Supercharger (Francis Energy) offers DC fast charging. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Phillips 66 A&W - Tesla Supercharger (Francis Energy)?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on a typical 50 kW DC fast charging at Phillips 66 A&W - Tesla Supercharger (Francis Energy). Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Phillips 66 A&W - Tesla Supercharger (Francis Energy)?
$0.44 per kWh
What charging network operates Phillips 66 A&W - Tesla Supercharger (Francis Energy)?
Phillips 66 A&W - Tesla Supercharger (Francis Energy) is part of the Tesla network. See more Tesla charging across OK on SpotCharge.
Can anyone use the chargers at Phillips 66 A&W - Tesla Supercharger (Francis Energy)?
Yes — Phillips 66 A&W - Tesla Supercharger (Francis Energy) is a publicly accessible charging location.
Is the Phillips 66 A&W - Tesla Supercharger (Francis Energy) listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oklahoma · 2024
Plug-in vehicles
57K
#23 in US
Battery-electric
23K
40% of fleet
EVs per public port
24.1
2,357 ports listed

As of 2024, Oklahoma had 56,900 plug-in vehicles registered — 22,600 fully battery-electric (40%) and 34,300 plug-in hybrid (60%). That ranks Oklahoma #23 nationally and represents about 0.9% of all US plug-in registrations.

Across 2,357 publicly-listed ports in Oklahoma (683 Level 2 and 1,674 DC fast), that works out to roughly 24.1 EVs per public port and 13.5 BEVs per DC fast port.

Oklahoma's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oklahoma market data →

More DC fast charging

DC fast charging in Davis →DC fast charging in Oklahoma →Tesla in Oklahoma →

More charging in Davis

See all →

Bedre Fine Chocolate

Davis, OK

DC FastFCN
2 stations · 4 ports200.5 kW

A&W Restaurant

Davis, OK

DC FastFrancis Energy
2 stations · 8 ports200 kW

Chickasaw Nation Welcome Center / Bedre Fine Chocolate - Francis Energy

Davis, OK

DC FastFrancis Energy
2 stations · 4 ports200 kW
Details
Pricing
$0.44 per kWh
Phone
877-798-3752
Network
Tesla ↗
Access
Public access

Last updated · 5 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging