SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOklahomaVinita
OK-382389

Cherokee Nation-Vinita

945 E Illinois Ave, Vinita, OK, 74301
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

3 stations · 4 ports
Cherokee Nation-Vinita · L2 J1772
FCN
AC L2 · 7.2 kW
Start session on FCN network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
Cherokee Nation-Vinita · DCFC CCS
FCN
DC fast · 50 kW
Start session on FCN network →
2ACCS· 50 kW· 480V/100A
Cherokee Nation-Vinita · DCFC CHAdeMO
FCN
DC fast · 50 kW
Start session on FCN network →
3ACHAdeMO· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

945 E Illinois Ave · Vinita, OK · 74301

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Cherokee Nation-Vinita located?
Cherokee Nation-Vinita is located at 945 E Illinois Ave, Vinita, OK.
What kind of charging does Cherokee Nation-Vinita offer?
Cherokee Nation-Vinita offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 3 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Cherokee Nation-Vinita?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Cherokee Nation-Vinita. Actual times vary with vehicle, temperature, and station load.
What are Cherokee Nation-Vinita's charging hours?
Open 24 hours
What charging network operates Cherokee Nation-Vinita?
Cherokee Nation-Vinita is part of the FCN network. See more FCN charging across OK on SpotCharge.
Can anyone use the chargers at Cherokee Nation-Vinita?
Yes — Cherokee Nation-Vinita is a publicly accessible charging location.
Is the Cherokee Nation-Vinita listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oklahoma · 2024
Plug-in vehicles
57K
#23 in US
Battery-electric
23K
40% of fleet
EVs per public port
25.8
2,204 ports listed

As of 2024, Oklahoma had 56,900 plug-in vehicles registered — 22,600 fully battery-electric (40%) and 34,300 plug-in hybrid (60%). That ranks Oklahoma #23 nationally and represents about 0.9% of all US plug-in registrations.

Across 2,204 publicly-listed ports in Oklahoma (611 Level 2 and 1,593 DC fast), that works out to roughly 25.8 EVs per public port and 14.2 BEVs per DC fast port.

Oklahoma's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oklahoma market data →

More charging in Vinita

See all →

Walmart 50 Vinita

Vinita, OK

DC FastElectrify America
4 stations · 5 ports350 kW
Details
Hours
Open 24 hours
Phone
800-489-1588
Network
FCN ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging