SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOklahomaArcadia
OK-073607

Edmond Water Treatment Plant

801 S Post Rd, Arcadia, OK, 73007
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Utility
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 2 ports
Edmond Water Treatment Plant · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

801 S Post Rd · Arcadia, OK · 73007

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Edmond Water Treatment Plant located?
Edmond Water Treatment Plant is located at 801 S Post Rd, Arcadia, OK.
What kind of charging does Edmond Water Treatment Plant offer?
Edmond Water Treatment Plant offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Edmond Water Treatment Plant?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Edmond Water Treatment Plant. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Edmond Water Treatment Plant?
Free
What are Edmond Water Treatment Plant's charging hours?
Open 24 hours
What charging network operates Edmond Water Treatment Plant?
Edmond Water Treatment Plant is part of the Non-Networked network. See more Non-Networked charging across OK on SpotCharge.
Can anyone use the chargers at Edmond Water Treatment Plant?
Edmond Water Treatment Plant is listed as by appointment access — check the details before visiting.
Is the Edmond Water Treatment Plant listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Oklahoma · 2024
Plug-in vehicles
57K
#23 in US
Battery-electric
23K
40% of fleet
EVs per public port
25.8
2,204 ports listed

As of 2024, Oklahoma had 56,900 plug-in vehicles registered — 22,600 fully battery-electric (40%) and 34,300 plug-in hybrid (60%). That ranks Oklahoma #23 nationally and represents about 0.9% of all US plug-in registrations.

Across 2,204 publicly-listed ports in Oklahoma (611 Level 2 and 1,593 DC fast), that works out to roughly 25.8 EVs per public port and 14.2 BEVs per DC fast port.

Oklahoma's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Oklahoma market data →

Details
Hours
Open 24 hours
Pricing
Free
Network
Non-Networked
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging