SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioDayton
OH-971742

MetLife - Dayton

9797 Springboro Pike, Dayton, OH, 45448

MetLife - Dayton is a office building in Dayton, OH with 2 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Charging is free. By appointment. Listing data from NREL, last confirmed November 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
📅Open since 2019
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
Free
Free

Stations & ports

1 station · 2 ports
MetLife - Dayton · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

9797 Springboro Pike · Dayton, OH · 45448

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MetLife - Dayton located?
MetLife - Dayton is located at 9797 Springboro Pike, Dayton, OH.
What kind of charging does MetLife - Dayton offer?
MetLife - Dayton offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at MetLife - Dayton?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at MetLife - Dayton. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at MetLife - Dayton?
Free
Can anyone use the chargers at MetLife - Dayton?
MetLife - Dayton is listed as by appointment access — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the MetLife - Dayton listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
—
no port data

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Every EV registered in Ohio is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Dayton

See all →

735 Wayne - Tesla Destination

Dayton, OH

Level 2Tesla Destination
2 stations · 4 ports12 kW

LEECORP1 DAYTON BRANCH

Dayton, OH

Level 2ChargePoint
2 stations · 4 ports11.5 kW

QuikTrip Dayton Exit 51

Dayton, OH

DC FastRed E Charge
1 station · 4 ports160.3 kW

Gem City Market

Dayton, OH

Level 2
1 station · 1 port7 kW
Details
Pricing
Free
Network
Non-networked
Access
By appointment
Workplace charging, mainly for employees · From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 10 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id143801
zip45448
cityDayton
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude39.608399
bd_blends—
longitude-84.231609
open_date2019-12-09
rd_blends—
ev_networkNon-Networked
ev_pricingFree
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMetLife - Dayton
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOFFICE_BLDG
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address9797 Springboro Pike
funding_sources—
owner_type_codeP
access_days_timeFor employee use only
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-11-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging