SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioChardon
OH-889467

City of Chardon Park Ave Trailhead

326 Park Avenue, Chardon, OH, 44024

City of Chardon Park Ave Trailhead is an EV charging location in Chardon, OH with 4 DC fast charging ports up to 50 kW on the FLO network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 4 ports
City of Chardon Park Ave Trailhead · DCFC CCS 50 kW
FLO
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on FLO network →
1ACCS· 50 kW
1BCCS· 50 kW
City of Chardon Park Ave Trailhead · DCFC CHAdeMO 50 kW
FLO
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on FLO network →
2ACHAdeMO· 50 kW
2BCHAdeMO· 50 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

326 Park Avenue · Chardon, OH · 44024

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is City of Chardon Park Ave Trailhead located?
City of Chardon Park Ave Trailhead is located at 326 Park Avenue, Chardon, OH.
What kind of charging does City of Chardon Park Ave Trailhead offer?
City of Chardon Park Ave Trailhead offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at City of Chardon Park Ave Trailhead?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at City of Chardon Park Ave Trailhead. Actual times vary with vehicle, temperature, and station load.
What are City of Chardon Park Ave Trailhead's charging hours?
24 hours daily
What charging network operates City of Chardon Park Ave Trailhead?
City of Chardon Park Ave Trailhead is part of the FLO network. See more FLO charging across OH on SpotCharge.
Can anyone use the chargers at City of Chardon Park Ave Trailhead?
Yes — City of Chardon Park Ave Trailhead is a publicly accessible charging location.
Is the City of Chardon Park Ave Trailhead listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
19.7
5,043 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 5,043 publicly-listed ports in Ohio (3,355 Level 2 and 1,688 DC fast), that works out to roughly 19.7 EVs per public port and 41.1 BEVs per DC fast port.

Ohio has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Ohio drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More DC fast charging

DC fast charging in Chardon →DC fast charging in Ohio →FLO in Ohio →

More charging in Chardon

See all →

CITY OF CHARDON CHARDON #1

Chardon, OH

Level 2ChargePoint
1 station · 2 ports6.5 kW

CITY OF CHARDON WATER ST CT4K 2

Chardon, OH

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-356-8911
Network
FLO ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id417711
zip44024
cityChardon
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude41.5781404
bd_blends—
longitude-81.208804
open_date2025-08-08
rd_blends—
ev_networkFLO
ev_pricing—
updated_at2026-09-20T04:26:36Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCity of Chardon Park Ave Trailhead
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-356-8911
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "9bc9d75e-b28b-4429-b8c5-d11683cae1aa",
    "fed4af27-e955-4ffa-9210-8c7b78d69c53"
  ],
  "station": [
    "2d28f541-f5bc-4a82-90a1-f9adf6c041e2"
  ]
}
ev_network_webhttps://www.flo.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address326 Park Avenue
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-20
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging