SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioDayton
OH-871221

UD R1 LOT

1700 South Patterson Boulevard R1 Lot, Dayton, OH, 45409
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
UD R1 LOT · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1700 South Patterson Boulevard R1 Lot · Dayton, OH · 45409

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is UD R1 LOT located?
UD R1 LOT is located at 1700 South Patterson Boulevard R1 Lot, Dayton, OH.
What kind of charging does UD R1 LOT offer?
UD R1 LOT offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at UD R1 LOT?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at UD R1 LOT. Actual times vary with vehicle, temperature, and station load.
What are UD R1 LOT's charging hours?
Open 24 hours
What charging network operates UD R1 LOT?
UD R1 LOT is part of the ChargePoint Network network. See more ChargePoint Network charging across OH on SpotCharge.
Can anyone use the chargers at UD R1 LOT?
Yes — UD R1 LOT is a publicly accessible charging location.
Is the UD R1 LOT listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
21.1
4,692 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 4,692 publicly-listed ports in Ohio (3,147 Level 2 and 1,545 DC fast), that works out to roughly 21.1 EVs per public port and 44.9 BEVs per DC fast port.

Ohio's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Dayton

See all →

QuikTrip Dayton Exit 51

Dayton, OH

DC FastRED_E
1 station · 4 ports50 kW

Gem City Market

Dayton, OH

Level 2Non-Networked
1 station · 1 port7.2 kW

Wastewater Operations and Control Building

Dayton, OH

Level 2AMPUP
1 station · 2 ports7.2 kW

Safety Building

Dayton, OH

Level 2AMPUP
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging