SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioSpringfield
OH-501598

JEFF WYLER POWER LINK

1501 Hillcrest Avenue, Springfield, OH, 45504

JEFF WYLER POWER LINK is an EV charging location in Springfield, OH with 2 DC fast charging ports up to 200 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
200 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
JEFF WYLER POWER LINK · DCFC CCS 200 kW
ChargePoint Network
DC fast · 200 kW

200 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 200 kW
JEFF WYLER POWER LINK · DCFC CHAdeMO 200 kW
ChargePoint Network
DC fast · 200 kW

200 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACHAdeMO· 200 kW

Estimated charging time

DC fast charging · 200 kW
~18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1501 Hillcrest Avenue · Springfield, OH · 45504

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is JEFF WYLER POWER LINK located?
JEFF WYLER POWER LINK is located at 1501 Hillcrest Avenue, Springfield, OH.
What kind of charging does JEFF WYLER POWER LINK offer?
JEFF WYLER POWER LINK offers DC fast charging, with stations rated up to 200 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at JEFF WYLER POWER LINK?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 18 min on 200 kW DC fast charging at JEFF WYLER POWER LINK. Actual times vary with vehicle, temperature, and station load.
What are JEFF WYLER POWER LINK's charging hours?
24 hours daily
What charging network operates JEFF WYLER POWER LINK?
JEFF WYLER POWER LINK is part of the ChargePoint network. See more ChargePoint charging across OH on SpotCharge.
Can anyone use the chargers at JEFF WYLER POWER LINK?
Yes — JEFF WYLER POWER LINK is a publicly accessible charging location.
Is the JEFF WYLER POWER LINK listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
19.7
5,043 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 5,043 publicly-listed ports in Ohio (3,355 Level 2 and 1,688 DC fast), that works out to roughly 19.7 EVs per public port and 41.1 BEVs per DC fast port.

Ohio has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Ohio drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More DC fast charging

DC fast charging in Springfield →DC fast charging in Ohio →ChargePoint in Ohio →

More charging in Springfield

See all →

Springfield, OH Rechargery @ Sheetz - Titus Rd

Springfield, OH

DC FastIONNA
2 stations · 10 ports400 kW

Springfield Beckley Municipal Airport

Springfield, OH

DC Fast
2 stations · 2 ports50 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id355166
zip45504
citySpringfield
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude39.942357
bd_blends—
longitude-83.833992
open_date2024-09-07
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:47:29Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameJEFF WYLER POWER LINK
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "26064911"
  ],
  "station": [
    "USCPIL16339621"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1501 Hillcrest Avenue
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 200,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 200,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging