SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioSwanton
OH-391909

Eugene F. Kranz Toledo Express Airport

11013 Airport Hwy, Swanton, OH, 43558

Eugene F. Kranz Toledo Express Airport is a pay lot in Swanton, OH with 4 Level 2 charging ports up to 8 kW on the POWERCHARGE network. Charging is free. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Pay lot
📅Open since 2024
🚚Fits Light-duty (cars, SUVs)
Max power
7.6 kW
AC Level 2
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
Tiered pricing
Free for first 4 hours; $2 per hour afterwards

Stations & ports

1 station · 4 ports
Eugene F. Kranz Toledo Express Airport · L2 J1772 7.6 kW
POWERCHARGE
AC L2 · 7.6 kW

7.6 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on POWERCHARGE network →
1AJ1772· 7.6 kW
1BJ1772· 7.6 kW
1CJ1772· 7.6 kW
1DJ1772· 7.6 kW

Estimated charging time

Level 2 (AC) · 7.6 kW
~7 h 41 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

11013 Airport Hwy · Swanton, OH · 43558

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Eugene F. Kranz Toledo Express Airport located?
Eugene F. Kranz Toledo Express Airport is located at 11013 Airport Hwy, Swanton, OH.
What kind of charging does Eugene F. Kranz Toledo Express Airport offer?
Eugene F. Kranz Toledo Express Airport offers Level 2 (AC) charging, with stations rated up to 7.6 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Eugene F. Kranz Toledo Express Airport?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 7 h 41 min on 7.6 kW Level 2 (AC) charging at Eugene F. Kranz Toledo Express Airport. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Eugene F. Kranz Toledo Express Airport?
Free for first 4 hours; $2 per hour afterwards
What are Eugene F. Kranz Toledo Express Airport's charging hours?
24 hours daily
What charging network operates Eugene F. Kranz Toledo Express Airport?
Eugene F. Kranz Toledo Express Airport is part of the POWERCHARGE network. See more POWERCHARGE charging across OH on SpotCharge.
Can anyone use the chargers at Eugene F. Kranz Toledo Express Airport?
Yes — Eugene F. Kranz Toledo Express Airport is a publicly accessible charging location. NREL lists the access detail as credit card at all times.
How do you pay for charging at Eugene F. Kranz Toledo Express Airport?
Eugene F. Kranz Toledo Express Airport accepts Visa, Mastercard, American Express, Discover and Debit card, according to NREL.
Is the Eugene F. Kranz Toledo Express Airport listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
—
no port data

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Every EV registered in Ohio is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

Details
Hours
24 hours daily
Pricing
Free for first 4 hours; $2 per hour afterwards
Phone
419-242-7515
Network
POWERCHARGE ↗
Access
Public access · Credit card at all times
From NREL
Payment
Visa, Mastercard, American Express, Discover, Debit card
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 12 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id417984
zip43558
citySwanton
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude41.592936
bd_blends—
longitude-83.806261
open_date2024-01-17
rd_blends—
ev_networkPOWERCHARGE
ev_pricingFree for first 4 hours; $2 per hour afterwards
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEugene F. Kranz Toledo Express Airport
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePAY_LOT
nps_unit_name—
station_phone419-242-7515
cards_acceptedA CREDIT D Debit M V
ev_dc_fast_num—
ev_network_webhttps://www.powerchargeev.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address11013 Airport Hwy
funding_sources—
owner_type_codeP
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "POWERCHARGE",
    "connectors": {
      "J1772": {
        "power_kw": 7.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "POWERCHARGE",
    "connectors": {
      "J1772": {
        "power_kw": 7.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "POWERCHARGE",
    "connectors": {
      "J1772": {
        "power_kw": 7.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "POWERCHARGE",
    "connectors": {
      "J1772": {
        "power_kw": 7.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_codeCREDIT_CARD_ALWAYS
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num4
access_days_time_fr—
date_last_confirmed2025-09-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic - Credit card at all times
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic - Carte de crédit en tout temps
intersection_directions_fr—
SpotCharge · Owner-listed EV charging