SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioBowling Green
OH-316506

Progress Park

500 Lehman Ave, Bowling Green, OH, 43402
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🌳Park
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 1 port
Progress Park · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

500 Lehman Ave · Bowling Green, OH · 43402

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Progress Park located?
Progress Park is located at 500 Lehman Ave, Bowling Green, OH.
What kind of charging does Progress Park offer?
Progress Park offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Progress Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Progress Park. Actual times vary with vehicle, temperature, and station load.
What are Progress Park's charging hours?
Open 24 hours
What charging network operates Progress Park?
Progress Park is part of the Non-Networked network. See more Non-Networked charging across OH on SpotCharge.
Can anyone use the chargers at Progress Park?
Progress Park is listed as by appointment access — check the details before visiting.
Is the Progress Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
21.1
4,692 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 4,692 publicly-listed ports in Ohio (3,147 Level 2 and 1,545 DC fast), that works out to roughly 21.1 EVs per public port and 44.9 BEVs per DC fast port.

Ohio's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Bowling Green

See all →

Bowling Green State University - Parking Lot A

Bowling Green, OH

Level 2Non-Networked
1 station · 4 ports7.2 kW

City of Bowling Green - City Park

Bowling Green, OH

Level 2Non-Networked
1 station · 1 port7.2 kW

City of Bowling Green - Parking Lot 3

Bowling Green, OH

Level 2Non-Networked
1 station · 1 port7.2 kW

City of Bowling Green - Parking Lot 2

Bowling Green, OH

Level 2Non-Networked
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 12 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging