SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioToledo
OH-294783

UTOLEDO MC PLANT OPS 1

2925 E Rocket Dr, Toledo, OH, 43606
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
UTOLEDO MC PLANT OPS 1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2925 E Rocket Dr · Toledo, OH · 43606

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is UTOLEDO MC PLANT OPS 1 located?
UTOLEDO MC PLANT OPS 1 is located at 2925 E Rocket Dr, Toledo, OH.
What kind of charging does UTOLEDO MC PLANT OPS 1 offer?
UTOLEDO MC PLANT OPS 1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at UTOLEDO MC PLANT OPS 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at UTOLEDO MC PLANT OPS 1. Actual times vary with vehicle, temperature, and station load.
What are UTOLEDO MC PLANT OPS 1's charging hours?
Open 24 hours
What charging network operates UTOLEDO MC PLANT OPS 1?
UTOLEDO MC PLANT OPS 1 is part of the ChargePoint Network network. See more ChargePoint Network charging across OH on SpotCharge.
Can anyone use the chargers at UTOLEDO MC PLANT OPS 1?
Yes — UTOLEDO MC PLANT OPS 1 is a publicly accessible charging location.
Is the UTOLEDO MC PLANT OPS 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
21.1
4,692 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 4,692 publicly-listed ports in Ohio (3,147 Level 2 and 1,545 DC fast), that works out to roughly 21.1 EVs per public port and 44.9 BEVs per DC fast port.

Ohio's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Toledo

See all →

BROWNHONDA STATION 1

Toledo, OH

DC FastChargePoint Network
2 stations · 2 ports50 kW

One Government Center Parking Garage

Toledo, OH

Level 2AMPUP
1 station · 1 port7.2 kW

Colony Lofts S7

Toledo, OH

Level 2Blink Network
1 station · 6 ports7.2 kW

Brondes Ford Toledo - Series

Toledo, OH

Level 2Blink Network
1 station · 6 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging