SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioGrove City
OH-266898

City of Grove City - Public Parking

4069 1st St, Grove City, OH, 43123

City of Grove City - Public Parking is a parking lot in Grove City, OH with 2 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Charging is free. 24 hours daily. Public access. Listing data from NREL, last confirmed July 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🅿️Parking lot
📅Open since 2015
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
Free
Free

Finding this location

  • Located in the parking lot behind the library

    Source · NREL

Stations & ports

1 station · 2 ports
City of Grove City - Public Parking · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4069 1st St · Grove City, OH · 43123

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is City of Grove City - Public Parking located?
City of Grove City - Public Parking is located at 4069 1st St, Grove City, OH.
What kind of charging does City of Grove City - Public Parking offer?
City of Grove City - Public Parking offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at City of Grove City - Public Parking?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at City of Grove City - Public Parking. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at City of Grove City - Public Parking?
Free
What are City of Grove City - Public Parking's charging hours?
24 hours daily
Can anyone use the chargers at City of Grove City - Public Parking?
Yes — City of Grove City - Public Parking is a publicly accessible charging location.
Is the City of Grove City - Public Parking listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
19.7
5,043 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 5,043 publicly-listed ports in Ohio (3,355 Level 2 and 1,688 DC fast), that works out to roughly 19.7 EVs per public port and 41.1 BEVs per DC fast port.

Ohio has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Ohio drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Grove City

See all →

MCGC GARAGE STATION 2

Grove City, OH

Level 2ChargePoint
1 station · 2 ports6.5 kW

Browns Farm

Grove City, OH

Level 2Blink
1 station · 2 ports10 kW

Brookfield Village Apartments

Grove City, OH

Level 2Blink
2 stations · 4 ports12 kW

Byers Chevrolet

Grove City, OH

DC FastEV Connect
1 station · 2 ports120 kW
Details
Hours
24 hours daily
Pricing
Free
Phone
614-277-3000
Network
Non-networked
Access
Public access
Ownership
Local or municipal government
From NREL

Verified by NREL · 15 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id74216
zip43123
cityGrove City
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude39.881378
bd_blends—
longitude-83.093302
open_date2015-05-01
rd_blends—
ev_networkNon-Networked
ev_pricingFree
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCity of Grove City - Public Parking
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePARKING_LOT
nps_unit_name—
station_phone614-277-3000
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address4069 1st St
funding_sources—
owner_type_codeLG
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-07-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsLocated in the parking lot behind the library
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging