SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioRio Grande
OH-226015

Village of Rio Grande - Municipal Building

174 E College St, Rio Grande, OH, 45674
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏛️Government
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 1 port
Village of Rio Grande - Municipal Building · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

174 E College St · Rio Grande, OH · 45674

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Village of Rio Grande - Municipal Building located?
Village of Rio Grande - Municipal Building is located at 174 E College St, Rio Grande, OH.
What kind of charging does Village of Rio Grande - Municipal Building offer?
Village of Rio Grande - Municipal Building offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Village of Rio Grande - Municipal Building?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Village of Rio Grande - Municipal Building. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Village of Rio Grande - Municipal Building?
Free
What are Village of Rio Grande - Municipal Building's charging hours?
Open 24 hours
What charging network operates Village of Rio Grande - Municipal Building?
Village of Rio Grande - Municipal Building is part of the Non-Networked network. See more Non-Networked charging across OH on SpotCharge.
Can anyone use the chargers at Village of Rio Grande - Municipal Building?
Yes — Village of Rio Grande - Municipal Building is a publicly accessible charging location.
Is the Village of Rio Grande - Municipal Building listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
21.1
4,692 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 4,692 publicly-listed ports in Ohio (3,147 Level 2 and 1,545 DC fast), that works out to roughly 21.1 EVs per public port and 44.9 BEVs per DC fast port.

Ohio's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

Details
Hours
Open 24 hours
Pricing
Free
Phone
740-245-5822
Network
Non-Networked
Access
Public access

Last updated · 10 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging