CLEVELAND FLEET CANAL BASIN 2
Cleveland, OH
CHURCH+STATE CS GW 1 is an EV charging location in Cleveland, OH with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.
Parking garage first floor on Church Avenue. The sign says Public Parking
Source · NREL
6.5 kW adds roughly 25 miles of range per hour for a typical EV.
Start session on ChargePoint Network network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.
Across 5,165 publicly-listed ports in Ohio (3,450 Level 2 and 1,715 DC fast), that works out to roughly 19.2 EVs per public port and 40.5 BEVs per DC fast port.
Ohio has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Ohio drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →
Cleveland, OH
Cleveland, OH
Cleveland, OH
Cleveland, OH
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 213588 |
|---|---|
| zip | 44113 |
| city | Cleveland |
| plus4 | — |
| state | OH |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 41.489883 |
| bd_blends | — |
| longitude | -81.710265 |
| open_date | 2022-04-08 |
| rd_blends | — |
| ev_network | ChargePoint Network |
| ev_pricing | — |
| unverified | No |
| updated_at | 2026-11-05T02:04:15Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | CHURCH+STATE CS GW 1 |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | — |
| nps_unit_name | — |
| station_phone | 888-758-4389 |
| cards_accepted | — |
| ev_dc_fast_num | — |
| ev_network_ids | {
"posts": [
"21541691",
"21541701"
],
"station": [
"USCPIL12418411"
]
} |
| ev_network_web | https://www.chargepoint.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 1436 church and stateway |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": 6.5,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
},
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": 6.5,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772 |
| ev_level1_evse_num | — |
| ev_level2_evse_num | 2 |
| access_days_time_fr | — |
| date_last_confirmed | 2026-11-05 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | Parking garage first floor on Church Avenue. The sign says Public Parking |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |