SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioCincinnati
OH-157113

CPR EV CHARGER EV CHARGER

2117 Dana Avenue, Cincinnati, OH, 45207

CPR EV CHARGER EV CHARGER is an EV charging location in Cincinnati, OH with 4 Level 2 charging ports up to 10 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
9.6 kW
AC Level 2
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 4 ports
CPR EV CHARGER EV CHARGER · L2 J1772 9.6 kW
ChargePoint Network
AC L2 · 9.6 kW

9.6 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 9.6 kW
1BJ1772· 9.6 kW
CPR EV CHARGER EV CHARGER · L2 Tesla 9.6 kW
ChargePoint Network
AC L2 · 9.6 kW

9.6 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
2ATesla· 9.6 kW
2BTesla· 9.6 kW

Estimated charging time

Level 2 (AC) · 9.6 kW
~6 h 5 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2117 Dana Avenue · Cincinnati, OH · 45207

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CPR EV CHARGER EV CHARGER located?
CPR EV CHARGER EV CHARGER is located at 2117 Dana Avenue, Cincinnati, OH.
What kind of charging does CPR EV CHARGER EV CHARGER offer?
CPR EV CHARGER EV CHARGER offers Level 2 (AC) charging, with stations rated up to 9.6 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at CPR EV CHARGER EV CHARGER?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 6 h 5 min on 9.6 kW Level 2 (AC) charging at CPR EV CHARGER EV CHARGER. Actual times vary with vehicle, temperature, and station load.
What are CPR EV CHARGER EV CHARGER's charging hours?
24 hours daily
What charging network operates CPR EV CHARGER EV CHARGER?
CPR EV CHARGER EV CHARGER is part of the ChargePoint network. See more ChargePoint charging across OH on SpotCharge.
Can anyone use the chargers at CPR EV CHARGER EV CHARGER?
Yes — CPR EV CHARGER EV CHARGER is a publicly accessible charging location.
Is the CPR EV CHARGER EV CHARGER listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
19.7
5,043 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 5,043 publicly-listed ports in Ohio (3,355 Level 2 and 1,688 DC fast), that works out to roughly 19.7 EVs per public port and 41.1 BEVs per DC fast port.

Ohio has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Ohio drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Cincinnati

See all →

VC LANE VC LANE 1

Cincinnati, OH

Level 2ChargePoint
2 stations · 4 ports15.4 kW

Building 7

Cincinnati, OH

Level 2Evoke
1 station · 1 port10 kW

Building 8

Cincinnati, OH

Level 2Evoke
1 station · 1 port10 kW

Building 6

Cincinnati, OH

Level 2Evoke
1 station · 1 port10 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id452237
zip45207
cityCincinnati
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude39.145002
bd_blends—
longitude-84.460778
open_date2026-04-01
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:10:52Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCPR EV CHARGER EV CHARGER
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "30557671",
    "30557681"
  ],
  "station": [
    "USCPIL19479381"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2117 Dana Avenue
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, TESLA
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging