SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioCincinnati
OH-143432

North College Hill Admin Bldg - Phase 1

1500 W. Galbraith Road, Cincinnati, OH, 45231

North College Hill Admin Bldg - Phase 1 is an EV charging location in Cincinnati, OH with 2 Level 2 charging ports up to 7 kW on the FLO network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
North College Hill Admin Bldg - Phase 1 · L2 J1772 7.2 kW
FLO
AC L2 · 7.2 kW

7.2 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on FLO network →
1AJ1772· 7.2 kW
1BJ1772· 7.2 kW

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1500 W. Galbraith Road · Cincinnati, OH · 45231

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is North College Hill Admin Bldg - Phase 1 located?
North College Hill Admin Bldg - Phase 1 is located at 1500 W. Galbraith Road, Cincinnati, OH.
What kind of charging does North College Hill Admin Bldg - Phase 1 offer?
North College Hill Admin Bldg - Phase 1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at North College Hill Admin Bldg - Phase 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at North College Hill Admin Bldg - Phase 1. Actual times vary with vehicle, temperature, and station load.
What are North College Hill Admin Bldg - Phase 1's charging hours?
24 hours daily
What charging network operates North College Hill Admin Bldg - Phase 1?
North College Hill Admin Bldg - Phase 1 is part of the FLO network. See more FLO charging across OH on SpotCharge.
Can anyone use the chargers at North College Hill Admin Bldg - Phase 1?
Yes — North College Hill Admin Bldg - Phase 1 is a publicly accessible charging location.
Is the North College Hill Admin Bldg - Phase 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
—
no port data

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Every EV registered in Ohio is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Cincinnati

See all →

VC LANE VC LANE 1

Cincinnati, OH

Level 2ChargePoint
2 stations · 4 ports15.4 kW

Building 7

Cincinnati, OH

Level 2Evoke
1 station · 1 port10 kW

Building 8

Cincinnati, OH

Level 2Evoke
1 station · 1 port10 kW

Building 6

Cincinnati, OH

Level 2Evoke
1 station · 1 port10 kW
Details
Hours
24 hours daily
Phone
888-356-8911
Network
FLO ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id194983
zip45231
cityCincinnati
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude39.217678
bd_blends—
longitude-84.542267
open_date2021-09-02
rd_blends—
ev_networkFLO
ev_pricing—
updated_at2026-09-16T04:23:30Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameNorth College Hill Admin Bldg - Phase 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-356-8911
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "3f7d12ba-d388-4689-bcb2-6c02632095eb",
    "b1cdc63f-3136-4332-8626-ee47920a1efe"
  ],
  "station": [
    "b47403c6-277b-4237-aa65-cf7c0ed0c565"
  ]
}
ev_network_webhttps://www.flo.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1500 W. Galbraith Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging