SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioPerrysburg
OH-136126

PERRY proTECH - Toledo Branch

1270 Flagship Dr, Perrysburg, OH, 43551

PERRY proTECH - Toledo Branch is an EV charging location in Perrysburg, OH with 2 Level 2 charging ports up to 19 kW on the evGateway network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
PERRY proTECH - Toledo Branch · L2 J1772 19.2 kW
EVGATEWAY
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on EVGATEWAY network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1270 Flagship Dr · Perrysburg, OH · 43551

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PERRY proTECH - Toledo Branch located?
PERRY proTECH - Toledo Branch is located at 1270 Flagship Dr, Perrysburg, OH.
What kind of charging does PERRY proTECH - Toledo Branch offer?
PERRY proTECH - Toledo Branch offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at PERRY proTECH - Toledo Branch?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at PERRY proTECH - Toledo Branch. Actual times vary with vehicle, temperature, and station load.
What are PERRY proTECH - Toledo Branch's charging hours?
24 hours daily
What charging network operates PERRY proTECH - Toledo Branch?
PERRY proTECH - Toledo Branch is part of the evGateway network. See more evGateway charging across OH on SpotCharge.
Can anyone use the chargers at PERRY proTECH - Toledo Branch?
Yes — PERRY proTECH - Toledo Branch is a publicly accessible charging location.
Is the PERRY proTECH - Toledo Branch listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
19.7
5,043 ports listed

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Across 5,043 publicly-listed ports in Ohio (3,355 Level 2 and 1,688 DC fast), that works out to roughly 19.7 EVs per public port and 41.1 BEVs per DC fast port.

Ohio has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Ohio drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Perrysburg

See all →

THS LEVIS 1

Perrysburg, OH

Level 2ChargePoint
1 station · 2 ports6.5 kW

NW ORLEANS PROP STATION 2WEST

Perrysburg, OH

Level 2ChargePoint
1 station · 2 ports6.5 kW

AAA Tire and Auto Service Perrysburg

Perrysburg, OH

Level 2Blink
1 station · 2 ports8.6 kW

City of Perrysburg Public Parking

Perrysburg, OH

Level 2
1 station · 2 ports
Details
Hours
24 hours daily
Phone
949-945-2000
Network
evGateway ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id421287
zip43551
cityPerrysburg
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude41.5353839
bd_blends—
longitude-83.645028
open_date2025-09-02
rd_blends—
ev_networkEVGATEWAY
ev_pricing—
updated_at2026-09-14T04:54:06Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_namePERRY proTECH - Toledo Branch
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone949-945-2000
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "75b6c41e-7b13-4cb7-9f86-89e147eec8ac",
    "f1f4f903-012d-46db-ad70-8c037e182aec"
  ],
  "station": [
    "b7b98a91-d94e-458d-8f65-bcc48b4488b7"
  ]
}
ev_network_webhttps://evgateway.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1270 Flagship Dr
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EVGATEWAY",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EVGATEWAY",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging