SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsOhioDelaware
OH-072592

DACC EV CHARGER DACC-STATION 1

4565 Columbus Pike, Delaware, OH, 43015

DACC EV CHARGER DACC-STATION 1 is an EV charging location in Delaware, OH with 4 Level 2 charging ports up to 13 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
13.4 kW
AC Level 2
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 4 ports
DACC EV CHARGER DACC-STATION 1 · L2 J1772 13.4 kW
ChargePoint Network
AC L2 · 13.4 kW

13.4 kW adds roughly 45 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 13.4 kW
1BJ1772· 13.4 kW
DACC EV CHARGER DACC-STATION 1 · L2 Tesla 13.4 kW
ChargePoint Network
AC L2 · 13.4 kW

13.4 kW adds roughly 45 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
2ATesla· 13.4 kW
2BTesla· 13.4 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4565 Columbus Pike · Delaware, OH · 43015

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is DACC EV CHARGER DACC-STATION 1 located?
DACC EV CHARGER DACC-STATION 1 is located at 4565 Columbus Pike, Delaware, OH.
What kind of charging does DACC EV CHARGER DACC-STATION 1 offer?
DACC EV CHARGER DACC-STATION 1 offers Level 2 (AC) charging, with stations rated up to 13.4 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at DACC EV CHARGER DACC-STATION 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at DACC EV CHARGER DACC-STATION 1. Actual times vary with vehicle, temperature, and station load.
What are DACC EV CHARGER DACC-STATION 1's charging hours?
24 hours daily
What charging network operates DACC EV CHARGER DACC-STATION 1?
DACC EV CHARGER DACC-STATION 1 is part of the ChargePoint network. See more ChargePoint charging across OH on SpotCharge.
Can anyone use the chargers at DACC EV CHARGER DACC-STATION 1?
Yes — DACC EV CHARGER DACC-STATION 1 is a publicly accessible charging location.
Is the DACC EV CHARGER DACC-STATION 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Ohio · 2024
Plug-in vehicles
99K
#18 in US
Battery-electric
69K
70% of fleet
EVs per public port
—
no port data

As of 2024, Ohio had 99,100 plug-in vehicles registered — 69,400 fully battery-electric (70%) and 29,700 plug-in hybrid (30%). That ranks Ohio #18 nationally and represents about 1.6% of all US plug-in registrations.

Every EV registered in Ohio is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Ohio market data →

More charging in Delaware

See all →

The Residences at Lucy Ridge

Delaware, OH

Level 2Blink
1 station · 2 ports10 kW

Byers Ford - Series

Delaware, OH

Level 2Blink
1 station · 6 ports16.6 kW

ED-LOT GRADYHOSPITAL2

Delaware, OH

Level 2ChargePoint
1 station · 2 ports6.5 kW

Stratford Ecological Center

Delaware, OH

Level 2
1 station · 1 port7 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id405644
zip43015
cityDelaware
plus4—
stateOH
ng_psi—
cng_psi—
countryUS
latitude40.231391
bd_blends—
longitude-83.037674
open_date2025-07-08
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T02:55:49Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameDACC EV CHARGER DACC-STATION 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "27445841",
    "27445851"
  ],
  "station": [
    "USCPIL17506931"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address4565 Columbus Pike
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 13.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 13.4,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 13.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 13.4,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, TESLA
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging