SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkNewark
NY-970849

Colacino Industries

126 Harrison St, Newark, NY, 14513

Colacino Industries is a office building in Newark, NY with 2 Level 2 charging ports on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
📅Open since 2021
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Colacino Industries · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

126 Harrison St · Newark, NY · 14513

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Colacino Industries located?
Colacino Industries is located at 126 Harrison St, Newark, NY.
What kind of charging does Colacino Industries offer?
Colacino Industries offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Colacino Industries?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Colacino Industries. Actual times vary with vehicle, temperature, and station load.
What charging network operates Colacino Industries?
Colacino Industries is part of the AmpUp network. See more AmpUp charging across NY on SpotCharge.
Can anyone use the chargers at Colacino Industries?
Colacino Industries is listed as by appointment access — check the details before visiting.
Is the Colacino Industries listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
13.7
20,371 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 20,371 publicly-listed ports in New York (15,316 Level 2 and 5,051 DC fast), that works out to roughly 13.7 EVs per public port and 33.3 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Newark

See all →

Newark Fire Station - Parking Lot

Newark, NY

Level 2Evoke
1 station · 8 ports7 kW

COLACINO INUSTR COLACINO 1

Newark, NY

Level 2ChargePoint
1 station · 2 ports6.5 kW
Newark Wayne Community Hospital

Newark Wayne Community Hospital

Newark, NY

Level 2ChargePoint
1 station · 8 ports6.1 kW
Details
Network
AmpUp ↗
Access
By appointment
Ownership
Privately owned
From NREL

Verified by NREL · 3 weeks ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id251389
zip14513
cityNewark
plus4—
stateNY
ng_psi—
cng_psi—
countryUS
latitude43.049554005
bd_blends—
longitude-77.093928829
open_date2021-11-03
rd_blends—
ev_networkAMPUP
ev_pricing—
updated_at2026-10-13T00:20:40Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameColacino Industries
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOFFICE_BLDG
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address126 Harrison St
funding_sources—
owner_type_codeP
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-10-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging