SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkJamestown
NY-712782

Cherry Street Parking Ramp

15 West 5th Street, Jamestown, NY, 14701

Cherry Street Parking Ramp is an EV charging location in Jamestown, NY with 2 Level 2 charging ports up to 7 kW on the EV Connect network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2015
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
Cherry Street Parking Ramp · L2 J1772 7.2 kW
EV Connect
AC L2 · 7.2 kW

7.2 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on EV Connect network →
1AJ1772· 7.2 kW
1BJ1772· 7.2 kW

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

15 West 5th Street · Jamestown, NY · 14701

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Cherry Street Parking Ramp located?
Cherry Street Parking Ramp is located at 15 West 5th Street, Jamestown, NY.
What kind of charging does Cherry Street Parking Ramp offer?
Cherry Street Parking Ramp offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Cherry Street Parking Ramp?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Cherry Street Parking Ramp. Actual times vary with vehicle, temperature, and station load.
What are Cherry Street Parking Ramp's charging hours?
24 hours daily
What charging network operates Cherry Street Parking Ramp?
Cherry Street Parking Ramp is part of the EV Connect network. See more EV Connect charging across NY on SpotCharge.
Can anyone use the chargers at Cherry Street Parking Ramp?
Yes — Cherry Street Parking Ramp is a publicly accessible charging location.
Is the Cherry Street Parking Ramp listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
—
no port data

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Every EV registered in New York is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Jamestown

See all →

EVolve NY Jamestown

Jamestown, NY

DC FastElectrify America
1 station · 6 ports350 kW

Yogi Bear's Jellystone Park

Jamestown, NY

Level 2Vialynk
1 station · 4 ports6.7 kW

Ed Shults Chevrolet Cadillac

Jamestown, NY

Level 2Blink
1 station · 2 ports8.6 kW

JAMESTOWN BPU PREND.4TH #2

Jamestown, NY

DC FastChargePoint
2 stations · 2 ports125 kW
Details
Hours
24 hours daily
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id94845
zip14701
cityJamestown
plus4—
stateNY
ng_psi—
cng_psi—
countryUS
latitude42.097747
bd_blends—
longitude-79.243142
open_date2015-07-22
rd_blends—
ev_networkEV Connect
ev_pricing—
updated_at2026-09-15T03:57:13Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCherry Street Parking Ramp
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone866-816-7584
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "6334036e769d347763921454",
    "64e6366476cae06af43f89e1"
  ],
  "station": [
    "553f1d6f-05f0-4388-9a6a-577ed7122c1b"
  ]
}
ev_network_webhttps://www.evconnect.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address15 West 5th Street
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging