SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkClifton Park
NY-591434

ATRIUM EVCHARGE EV10

451 Clifton Park Center Rd, Clifton Park, NY, 12065

ATRIUM EVCHARGE EV10 is an EV charging location in Clifton Park, NY with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2022
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • In parking lot.

    Source · NREL

Stations & ports

1 station · 2 ports
ATRIUM EVCHARGE EV10 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

451 Clifton Park Center Rd · Clifton Park, NY · 12065

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ATRIUM EVCHARGE EV10 located?
ATRIUM EVCHARGE EV10 is located at 451 Clifton Park Center Rd, Clifton Park, NY.
What kind of charging does ATRIUM EVCHARGE EV10 offer?
ATRIUM EVCHARGE EV10 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at ATRIUM EVCHARGE EV10?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at ATRIUM EVCHARGE EV10. Actual times vary with vehicle, temperature, and station load.
What are ATRIUM EVCHARGE EV10's charging hours?
24 hours daily
What charging network operates ATRIUM EVCHARGE EV10?
ATRIUM EVCHARGE EV10 is part of the ChargePoint network. See more ChargePoint charging across NY on SpotCharge.
Can anyone use the chargers at ATRIUM EVCHARGE EV10?
Yes — ATRIUM EVCHARGE EV10 is a publicly accessible charging location.
Is the ATRIUM EVCHARGE EV10 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
—
no port data

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Every EV registered in New York is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Clifton Park

See all →

Vent Fitness Clifton Park

Clifton Park, NY

Level 2QUICKCHARGE
1 station · 2 ports7.6 kW

Residence 15

Clifton Park, NY

Level 2QUICKCHARGE
1 station · 8 ports11.5 kW

Perlmutter Eye Center

Clifton Park, NY

Level 2QUICKCHARGE
1 station · 4 ports11.5 kW

Pasta Pane

Clifton Park, NY

Level 2QUICKCHARGE
1 station · 4 ports7.6 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id225559
zip12065
cityClifton Park
plus4—
stateNY
ng_psi—
cng_psi—
countryUS
latitude42.855974
bd_blends—
longitude-73.785474
open_date2022-08-16
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T02:07:07Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameATRIUM EVCHARGE EV10
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "21928821",
    "21928831"
  ],
  "station": [
    "USCPIL12679721"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address451 Clifton Park Center Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsIn parking lot.
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging