SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkWoodside
NY-562454

East End Studio

48-37 48th St, Woodside, NY, 11377

East End Studio is an EV charging location in Woodside, NY with 11 Level 2 charging ports on the Vialynk network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Public access. Listing data from NREL, last confirmed June 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
—
AC Level 2
Ports
11
ports
Hours
—
Pricing
—

Stations & ports

1 station · 11 ports
East End Studio · L2 J1772
VIALYNK
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on VIALYNK network →
1AJ1772
1BJ1772
1CJ1772
1DJ1772
1EJ1772
1FJ1772
1GJ1772
1HJ1772
1IJ1772
1JJ1772
1KJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

48-37 48th St · Woodside, NY · 11377

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is East End Studio located?
East End Studio is located at 48-37 48th St, Woodside, NY.
What kind of charging does East End Studio offer?
East End Studio offers Level 2 (AC) charging. There is 1 charging station and 11 total ports at this location.
How long does it take to charge an EV at East End Studio?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at East End Studio. Actual times vary with vehicle, temperature, and station load.
What charging network operates East End Studio?
East End Studio is part of the Vialynk network. See more Vialynk charging across NY on SpotCharge.
Can anyone use the chargers at East End Studio?
Yes — East End Studio is a publicly accessible charging location.
Is the East End Studio listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
13.2
21,121 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 21,121 publicly-listed ports in New York (16,045 Level 2 and 5,072 DC fast), that works out to roughly 13.2 EVs per public port and 33.1 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Woodside

See all →

ENG-000048

Woodside, NY

Level 2WEVO
1 station · 2 ports7.2 kW

QT STATION 1

Woodside, NY

Level 2ChargePoint
1 station · 2 ports6.5 kW

PV Parking 40-07 73RD St

Woodside, NY

Level 2Tesla Destination
1 station · 4 ports6 kW
Details
Phone
833-611-5965
Network
Vialynk ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging