SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkWoodside
NY-562454

East End Studio

48-37 48th St, Woodside, NY, 11377
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
11
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 11 ports
East End Studio · L2 J1772
VIALYNK
AC L2 · 7.2 kW
Start session on VIALYNK network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

48-37 48th St · Woodside, NY · 11377

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is East End Studio located?
East End Studio is located at 48-37 48th St, Woodside, NY.
What kind of charging does East End Studio offer?
East End Studio offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 11 total ports at this location.
How long does it take to charge an EV at East End Studio?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at East End Studio. Actual times vary with vehicle, temperature, and station load.
What are East End Studio's charging hours?
Open 24 hours
What charging network operates East End Studio?
East End Studio is part of the VIALYNK network. See more VIALYNK charging across NY on SpotCharge.
Can anyone use the chargers at East End Studio?
Yes — East End Studio is a publicly accessible charging location.
Is the East End Studio listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
15.7
17,783 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 17,783 publicly-listed ports in New York (13,496 Level 2 and 4,283 DC fast), that works out to roughly 15.7 EVs per public port and 39.2 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Woodside

See all →

ENG-000048

Woodside, NY

Level 2WEVO
1 station · 2 ports7.2 kW

Paragon Acura

Woodside, NY

DC FastBlink Network
1 station · 2 ports50 kW

QT STATION 1

Woodside, NY

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PV Parking 40-07 73RD St

Woodside, NY

Level 2Tesla Destination
1 station · 4 ports6 kW
Details
Hours
Open 24 hours
Phone
833-611-5965
Network
VIALYNK ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging