SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkWaterville
NY-513476

Village Hall Parking Lot

122 Barton Ave, Waterville, NY, 13480
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Village Hall Parking Lot · L2 J1772
NOODOE
AC L2 · 7.2 kW
Start session on NOODOE network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

122 Barton Ave · Waterville, NY · 13480

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Village Hall Parking Lot located?
Village Hall Parking Lot is located at 122 Barton Ave, Waterville, NY.
What kind of charging does Village Hall Parking Lot offer?
Village Hall Parking Lot offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Village Hall Parking Lot?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Village Hall Parking Lot. Actual times vary with vehicle, temperature, and station load.
What are Village Hall Parking Lot's charging hours?
Open 24 hours
What charging network operates Village Hall Parking Lot?
Village Hall Parking Lot is part of the NOODOE network. See more NOODOE charging across NY on SpotCharge.
Can anyone use the chargers at Village Hall Parking Lot?
Yes — Village Hall Parking Lot is a publicly accessible charging location.
Is the Village Hall Parking Lot listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
15.7
17,783 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 17,783 publicly-listed ports in New York (13,496 Level 2 and 4,283 DC fast), that works out to roughly 15.7 EVs per public port and 39.2 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Waterville

See all →

Main St. Parking Lot

Waterville, NY

Level 2NOODOE
1 station · 1 port7.2 kW

Village of Waterville - West Main Street

Waterville, NY

Level 2Non-Networked
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-222-6618
Network
NOODOE ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging