SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkHudson
NY-451714

CGCC PAC Lot

4400 NY-23, Hudson, NY, 12534
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
10
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 10 ports
CGCC PAC Lot · L2 J1772
VIALYNK
AC L2 · 7.2 kW
Start session on VIALYNK network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4400 NY-23 · Hudson, NY · 12534

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CGCC PAC Lot located?
CGCC PAC Lot is located at 4400 NY-23, Hudson, NY.
What kind of charging does CGCC PAC Lot offer?
CGCC PAC Lot offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 10 total ports at this location.
How long does it take to charge an EV at CGCC PAC Lot?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at CGCC PAC Lot. Actual times vary with vehicle, temperature, and station load.
What are CGCC PAC Lot's charging hours?
Open 24 hours
What charging network operates CGCC PAC Lot?
CGCC PAC Lot is part of the VIALYNK network. See more VIALYNK charging across NY on SpotCharge.
Can anyone use the chargers at CGCC PAC Lot?
Yes — CGCC PAC Lot is a publicly accessible charging location.
Is the CGCC PAC Lot listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
15.7
17,783 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 17,783 publicly-listed ports in New York (13,496 Level 2 and 4,283 DC fast), that works out to roughly 15.7 EVs per public port and 39.2 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Hudson

See all →

Columbia County Court

Hudson, NY

Level 2VIALYNK
1 station · 4 ports7.2 kW

401 State St

Hudson, NY

Level 2VIALYNK
1 station · 4 ports7.2 kW

178 Route 23B - Columbia County

Hudson, NY

Level 2VIALYNK
1 station · 6 ports7.2 kW

SWTCH Energy Inc.

Hudson, NY

Level 2SWTCH
1 station · 6 ports7.2 kW
Details
Hours
Open 24 hours
Phone
833-611-5965
Network
VIALYNK ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging