SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkFredonia
NY-408071

National Grid - Fredonia

401 Water St, Fredonia, NY, 14063
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Utility
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
National Grid - Fredonia · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

401 Water St · Fredonia, NY · 14063

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is National Grid - Fredonia located?
National Grid - Fredonia is located at 401 Water St, Fredonia, NY.
What kind of charging does National Grid - Fredonia offer?
National Grid - Fredonia offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at National Grid - Fredonia?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at National Grid - Fredonia. Actual times vary with vehicle, temperature, and station load.
What are National Grid - Fredonia's charging hours?
Open 24 hours
What charging network operates National Grid - Fredonia?
National Grid - Fredonia is part of the ChargePoint Network network. See more ChargePoint Network charging across NY on SpotCharge.
Can anyone use the chargers at National Grid - Fredonia?
National Grid - Fredonia is listed as by appointment access — check the details before visiting.
Is the National Grid - Fredonia listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
15.7
17,783 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 17,783 publicly-listed ports in New York (13,496 Level 2 and 4,283 DC fast), that works out to roughly 15.7 EVs per public port and 39.2 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in Fredonia

See all →

ENG-000007

Fredonia, NY

Level 2WEVO
1 station · 6 ports7.2 kW

Econo Lodge - Dunkirk

Fredonia, NY

Level 2CHARGESMART_EV
1 station · 10 ports7.2 kW

FSA DODS HALL

Fredonia, NY

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

FSA STARBUCKS

Fredonia, NY

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Network
ChargePoint Network ↗
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging