WEST HERR AUTO WH FA L3-2 PL
Getzville, NY
WEST HERR AUTO WH FA SVL3-2 PL is an EV charging location in Getzville, NY with 2 DC fast charging ports up to 200 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.
200 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.
Start session on ChargePoint Network network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.
Across 21,124 publicly-listed ports in New York (16,044 Level 2 and 5,076 DC fast), that works out to roughly 13.2 EVs per public port and 33.1 BEVs per DC fast port.
New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full New York market data →
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 329538 |
|---|---|
| zip | 14068 |
| city | Getzville |
| plus4 | — |
| state | NY |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 43.016636 |
| bd_blends | — |
| longitude | -78.768572 |
| open_date | 2024-02-29 |
| rd_blends | — |
| ev_network | ChargePoint Network |
| ev_pricing | — |
| updated_at | 2026-09-18T02:38:42Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | WEST HERR AUTO WH FA SVL3-2 PL |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | — |
| nps_unit_name | — |
| station_phone | 888-758-4389 |
| cards_accepted | — |
| ev_dc_fast_num | 2 |
| ev_network_ids | {
"posts": [
"25123691",
"25123701"
],
"station": [
"USCPIL15551611"
]
} |
| ev_network_web | https://www.chargepoint.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 10 Campbell Boulevard |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 200,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 200,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-09-18 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |