SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew YorkNew Rochelle
NY-160756

Two Clinton Park

50 Clinton Pl, New Rochelle, NY, 10801
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Multi-unit residence
Max power
7.2 kW
AC Level 2
Ports
25
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 25 ports
Two Clinton Park · L2 J1772
EVOKE
AC L2 · 7.2 kW
Start session on EVOKE network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A
1LJ1772· 7.2 kW· 240V/30A
1MJ1772· 7.2 kW· 240V/30A
1NJ1772· 7.2 kW· 240V/30A
1OJ1772· 7.2 kW· 240V/30A
1PJ1772· 7.2 kW· 240V/30A
1QJ1772· 7.2 kW· 240V/30A
1RJ1772· 7.2 kW· 240V/30A
1SJ1772· 7.2 kW· 240V/30A
1TJ1772· 7.2 kW· 240V/30A
1UJ1772· 7.2 kW· 240V/30A
1VJ1772· 7.2 kW· 240V/30A
1WJ1772· 7.2 kW· 240V/30A
1XJ1772· 7.2 kW· 240V/30A
1YJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

50 Clinton Pl · New Rochelle, NY · 10801

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Two Clinton Park located?
Two Clinton Park is located at 50 Clinton Pl, New Rochelle, NY.
What kind of charging does Two Clinton Park offer?
Two Clinton Park offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 25 total ports at this location.
How long does it take to charge an EV at Two Clinton Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Two Clinton Park. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Two Clinton Park?
Free
What are Two Clinton Park's charging hours?
Open 24 hours
What charging network operates Two Clinton Park?
Two Clinton Park is part of the EVOKE network. See more EVOKE charging across NY on SpotCharge.
Can anyone use the chargers at Two Clinton Park?
Yes — Two Clinton Park is a publicly accessible charging location.
Is the Two Clinton Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New York · 2024
Plug-in vehicles
280K
#4 in US
Battery-electric
168K
60% of fleet
EVs per public port
15.7
17,783 ports listed

As of 2024, New York had 279,500 plug-in vehicles registered — 168,100 fully battery-electric (60%) and 111,400 plug-in hybrid (40%). That ranks New York #4 nationally and represents about 4.6% of all US plug-in registrations.

Across 17,783 publicly-listed ports in New York (13,496 Level 2 and 4,283 DC fast), that works out to roughly 15.7 EVs per public port and 39.2 BEVs per DC fast port.

New York has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New York drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New York market data →

More charging in New Rochelle

See all →

New Rochelle Series

New Rochelle, NY

Level 2Blink Network
1 station · 2 ports7.2 kW

SWTCH Energy

New Rochelle, NY

Level 2SWTCH
1 station · 3 ports7.2 kW

CEDAR PLAZA CEDAR EVCHARGER

New Rochelle, NY

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Centre at Huguenot South Tower - Parking Garage 2nd Floor

New Rochelle, NY

Level 2EVOKE
1 station · 14 ports7.2 kW
Details
Hours
Open 24 hours
Pricing
Free
Phone
813-492-5220
Network
EVOKE ↗
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging