SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew MexicoAlbuquerque
NM-915721

ABQ CELL LOT POWERLINK-2

2325 Sunport Loop Southeast, Albuquerque, NM, 87106

ABQ CELL LOT POWERLINK-2 is an EV charging location in Albuquerque, NM with 4 DC fast charging ports up to 120 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
120 kW
DC fast
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Sunport Cell Phone Lot

    Source · NREL

Stations & ports

2 stations · 4 ports
ABQ CELL LOT POWERLINK-2 · DCFC CCS 120 kW
ChargePoint Network
DC fast · 120 kW

120 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 120 kW
1BCCS· 120 kW
ABQ CELL LOT POWERLINK-2 · DCFC Tesla 120 kW
ChargePoint Network
DC fast · 120 kW

120 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ATesla· 120 kW
2BTesla· 120 kW

Estimated charging time

DC fast charging · 120 kW
~29 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2325 Sunport Loop Southeast · Albuquerque, NM · 87106

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ABQ CELL LOT POWERLINK-2 located?
ABQ CELL LOT POWERLINK-2 is located at 2325 Sunport Loop Southeast, Albuquerque, NM.
What kind of charging does ABQ CELL LOT POWERLINK-2 offer?
ABQ CELL LOT POWERLINK-2 offers DC fast charging, with stations rated up to 120 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at ABQ CELL LOT POWERLINK-2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 29 min on 120 kW DC fast charging at ABQ CELL LOT POWERLINK-2. Actual times vary with vehicle, temperature, and station load.
What are ABQ CELL LOT POWERLINK-2's charging hours?
24 hours daily
What charging network operates ABQ CELL LOT POWERLINK-2?
ABQ CELL LOT POWERLINK-2 is part of the ChargePoint network. See more ChargePoint charging across NM on SpotCharge.
Can anyone use the chargers at ABQ CELL LOT POWERLINK-2?
Yes — ABQ CELL LOT POWERLINK-2 is a publicly accessible charging location.
Is the ABQ CELL LOT POWERLINK-2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New Mexico · 2024
Plug-in vehicles
19K
#36 in US
Battery-electric
13K
69% of fleet
EVs per public port
13.9
1,355 ports listed

As of 2024, New Mexico had 18,800 plug-in vehicles registered — 13,000 fully battery-electric (69%) and 5,800 plug-in hybrid (31%). That ranks New Mexico #36 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,355 publicly-listed ports in New Mexico (544 Level 2 and 811 DC fast), that works out to roughly 13.9 EVs per public port and 16 BEVs per DC fast port.

New Mexico has comparatively strong public charging coverage today. Listing here keeps your stations visible as more New Mexico drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full New Mexico market data →

More DC fast charging

DC fast charging in Albuquerque →DC fast charging in New Mexico →ChargePoint in New Mexico →

More charging in Albuquerque

See all →

Best Western Plus Rio Grande Inn - Tesla Destination

Albuquerque, NM

Level 2Tesla Destination
2 stations · 6 ports

Kootz Defense Campus Wild West EV - Tesla Destination

Albuquerque, NM

Level 2Tesla Destination
2 stations · 6 ports

BERNALILLO CO. F STATION 36 EM

Albuquerque, NM

Level 2ChargePoint
1 station · 2 ports19.2 kW

UNM UNMPD 1

Albuquerque, NM

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id458450
zip87106
cityAlbuquerque
plus4—
stateNM
ng_psi—
cng_psi—
countryUS
latitude35.050653
bd_blends—
longitude-106.61976
open_date2026-04-30
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:14:00Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameABQ CELL LOT POWERLINK-2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "30798271",
    "30798281"
  ],
  "station": [
    "USCPIL19678681"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2325 Sunport Loop Southeast
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 120,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 120,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO, TESLA
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsSunport Cell Phone Lot
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging