SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew JerseySomerville
NJ-555588

BRIDGEWATER CT4021-1

1028 US-22, Somerville, NJ, 08876
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
BRIDGEWATER CT4021-1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1028 US-22 · Somerville, NJ · 08876

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is BRIDGEWATER CT4021-1 located?
BRIDGEWATER CT4021-1 is located at 1028 US-22, Somerville, NJ.
What kind of charging does BRIDGEWATER CT4021-1 offer?
BRIDGEWATER CT4021-1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at BRIDGEWATER CT4021-1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at BRIDGEWATER CT4021-1. Actual times vary with vehicle, temperature, and station load.
What are BRIDGEWATER CT4021-1's charging hours?
Open 24 hours
What charging network operates BRIDGEWATER CT4021-1?
BRIDGEWATER CT4021-1 is part of the ChargePoint Network network. See more ChargePoint Network charging across NJ on SpotCharge.
Can anyone use the chargers at BRIDGEWATER CT4021-1?
Yes — BRIDGEWATER CT4021-1 is a publicly accessible charging location.
Is the BRIDGEWATER CT4021-1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New Jersey · 2024
Plug-in vehicles
225K
#6 in US
Battery-electric
174K
77% of fleet
EVs per public port
39
5,783 ports listed

As of 2024, New Jersey had 225,400 plug-in vehicles registered — 173,800 fully battery-electric (77%) and 51,600 plug-in hybrid (23%). That ranks New Jersey #6 nationally and represents about 3.7% of all US plug-in registrations.

Across 5,783 publicly-listed ports in New Jersey (3,044 Level 2 and 2,733 DC fast), that works out to roughly 39 EVs per public port and 63.6 BEVs per DC fast port.

New Jersey's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full New Jersey market data →

More charging in Somerville

See all →

Somerville - The Edge at Main

Somerville, NJ

Level 2CHARGELAB
1 station · 8 ports7.2 kW

RWJ Somerset

Somerville, NJ

Level 2EVOKE
1 station · 8 ports7.2 kW

SOMERSET COUNTY 46 EAST HIGH ST

Somerville, NJ

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Somerville Parc

Somerville, NJ

Level 2EV Connect
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging