SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew JerseyRahway
NJ-078005

Hamilton Stage- Union County Performing Arts Center

360 Hamilton Street, Rahway, NJ, 07065
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Finding this location

  • Two EV Wall-Mounted Charging Stations (Level 2, 7.2kW Capacity) located in the parking lot behind Hamilton Stage (southwest corner of the building)

    Source · OpenChargeMap

Stations & ports

1 station · 2 ports
Hamilton Stage- Union County Performing Arts Center
(Unknown Operator)
AC L2 · 7.2 kW
1ACCS· 7.2 kW· 240V/32A
1BCCS· 7.2 kW· 240V/32A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

360 Hamilton Street · Rahway, NJ · 07065

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Hamilton Stage- Union County Performing Arts Center located?
Hamilton Stage- Union County Performing Arts Center is located at 360 Hamilton Street, Rahway, NJ.
What kind of charging does Hamilton Stage- Union County Performing Arts Center offer?
Hamilton Stage- Union County Performing Arts Center offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Hamilton Stage- Union County Performing Arts Center?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Hamilton Stage- Union County Performing Arts Center. Actual times vary with vehicle, temperature, and station load.
What are Hamilton Stage- Union County Performing Arts Center's charging hours?
Open 24 hours
What charging network operates Hamilton Stage- Union County Performing Arts Center?
Hamilton Stage- Union County Performing Arts Center is part of the (Unknown Operator) network. See more (Unknown Operator) charging across NJ on SpotCharge.
Can anyone use the chargers at Hamilton Stage- Union County Performing Arts Center?
Yes — Hamilton Stage- Union County Performing Arts Center is a publicly accessible charging location.
Is the Hamilton Stage- Union County Performing Arts Center listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New Jersey · 2024
Plug-in vehicles
225K
#6 in US
Battery-electric
174K
77% of fleet
EVs per public port
39
5,783 ports listed

As of 2024, New Jersey had 225,400 plug-in vehicles registered — 173,800 fully battery-electric (77%) and 51,600 plug-in hybrid (23%). That ranks New Jersey #6 nationally and represents about 3.7% of all US plug-in registrations.

Across 5,783 publicly-listed ports in New Jersey (3,044 Level 2 and 2,733 DC fast), that works out to roughly 39 EVs per public port and 63.6 BEVs per DC fast port.

New Jersey's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full New Jersey market data →

More charging in Rahway

See all →

Merck - Rahway, NJ - Tesla Destination

Rahway, NJ

Level 2Tesla Destination
1 station · 36 ports7.2 kW

Merck SPARE LOCATION

Rahway, NJ

Level 2OpConnect
1 station · 11 ports7.2 kW

Merck Lot B28

Rahway, NJ

Level 2OpConnect
1 station · 3 ports7.2 kW

THEMINTATRAHWAY MINT STATION #3

Rahway, NJ

Level 2ChargePoint Network
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Network
(Unknown Operator)
Access
Public access

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap15 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID70545
UUID24EC5B90-E93A-42AF-85F1-E5814FE3F464
OperatorID1
AddressInfo
{
  "ID": 70891,
  "Town": "Rahway",
  "Title": "Hamilton Stage- Union County Performing Arts Center",
  "Latitude": 40.6115606,
  "Postcode": "07065",
  "CountryID": 2,
  "Longitude": -74.2798535,
  "AddressLine1": "360 Hamilton Street",
  "DistanceUnit": 0,
  "StateOrProvince": "NJ"
}
Connections
[
  {
    "ID": 100974,
    "Amps": 32,
    "LevelID": 2,
    "PowerKW": 7.2,
    "Voltage": 240,
    "Quantity": 2,
    "CurrentTypeID": 10,
    "ConnectionTypeID": 32
  }
]
DateCreated2016-07-25T02:45:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 1,
  "Title": "(Unknown Operator)",
  "Comments": null,
  "BookingURL": null,
  "WebsiteURL": null,
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": null,
  "IsPrivateIndividual": null,
  "PhonePrimaryContact": null,
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
NumberOfPoints2
GeneralCommentsTwo EV Wall-Mounted Charging Stations (Level 2, 7.2kW Capacity) located in the parking lot behind Hamilton Stage (southwest corner of the building)
DateLastVerified2016-08-01T07:37:00Z
DateLastStatusUpdate2016-08-01T07:37:00Z
SubmissionStatusTypeID200
SpotCharge · Data via OpenChargeMap