Brewhalla - Market / Events / Hotel - Tesla Destination
Fargo, ND
CITY OF FARGO DCFC1 is an EV charging location in Fargo, ND with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from OpenChargeMap and NREL, last confirmed September 2026.
24 hours daily
62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, North Dakota had 2,300 plug-in vehicles registered — 1,300 fully battery-electric (57%) and 1,000 plug-in hybrid (43%). That ranks North Dakota #51 nationally and represents about 0.0% of all US plug-in registrations.
Across 320 publicly-listed ports in North Dakota (137 Level 2 and 183 DC fast), that works out to roughly 7.2 EVs per public port and 7.1 BEVs per DC fast port.
North Dakota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more North Dakota drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full North Dakota market data →
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 201963 |
|---|---|
| zip | 58102 |
| city | Fargo |
| plus4 | — |
| state | ND |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 46.878763 |
| bd_blends | — |
| longitude | -96.783547 |
| open_date | 2021-12-03 |
| rd_blends | — |
| ev_network | ChargePoint Network |
| ev_pricing | — |
| updated_at | 2026-09-16T01:49:10Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | CITY OF FARGO DCFC1 |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | — |
| nps_unit_name | — |
| station_phone | 888-758-4389 |
| cards_accepted | — |
| ev_dc_fast_num | 1 |
| ev_network_ids | {
"posts": [
"12380471"
],
"station": [
"USCPIL7210021"
]
} |
| ev_network_web | https://www.chargepoint.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 225 4th St N |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": 62.5,
"port_count": 1
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 62,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | CHADEMO, J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-09-16 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |
From OpenChargeMap · CC-BY-SA 4.0
| ID | 233509 |
|---|---|
| UUID | 49F5665E-E27F-49F0-A56D-F4689D18D9EC |
| OperatorID | 5 |
| AddressInfo | {
"ID": 233892,
"Town": "Fargo",
"Title": "CITY OF FARGO DCFC1",
"Latitude": 46.878773,
"Postcode": "58102",
"CountryID": 2,
"Longitude": -96.78356,
"RelatedURL": "http://www.chargepoint.com/",
"AddressLine1": "225 4th St N",
"DistanceUnit": 0,
"AccessComments": "24 hours daily",
"StateOrProvince": "ND",
"ContactTelephone1": "888-758-4389"
} |
| Connections | [
{
"ID": 385474,
"LevelID": 3,
"PowerKW": 62.5,
"Comments": "kW power is an estimate based on the connection type",
"Quantity": 1,
"CurrentTypeID": 30,
"ConnectionTypeID": 2
},
{
"ID": 385475,
"LevelID": 3,
"PowerKW": 62.5,
"Comments": "kW power is an estimate based on the connection type",
"Quantity": 1,
"CurrentTypeID": 30,
"ConnectionTypeID": 32
}
] |
| DateCreated | 2023-02-13T05:38:00Z |
| UsageTypeID | 1 |
| OperatorInfo | {
"ID": 5,
"Title": "ChargePoint",
"Comments": "GB*CPI,AT*HTB",
"BookingURL": null,
"WebsiteURL": "http://www.chargepoint.net/",
"AddressInfo": null,
"ContactEmail": null,
"FaultReportEmail": null,
"IsRestrictedEdit": false,
"IsPrivateIndividual": false,
"PhonePrimaryContact": "1-408-841-4500",
"PhoneSecondaryContact": null
} |
| StatusTypeID | 50 |
| DataProviderID | 1 |
| DateLastVerified | 2023-12-20T15:52:00Z |
| DateLastStatusUpdate | 2023-12-20T15:52:00Z |
| SubmissionStatusTypeID | 100 |