SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNorth CarolinaKill Devil Hills
NC-825755

SERO: WRBR Maintenace Yard

800 Colington Rd, Kill Devil Hills, NC, 27948

SERO: WRBR Maintenace Yard is a fed gov in Kill Devil Hills, NC with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
📅Open since 2025
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
SERO: WRBR Maintenace Yard · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

800 Colington Rd · Kill Devil Hills, NC · 27948

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SERO: WRBR Maintenace Yard located?
SERO: WRBR Maintenace Yard is located at 800 Colington Rd, Kill Devil Hills, NC.
What kind of charging does SERO: WRBR Maintenace Yard offer?
SERO: WRBR Maintenace Yard offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at SERO: WRBR Maintenace Yard?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at SERO: WRBR Maintenace Yard. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at SERO: WRBR Maintenace Yard?
SERO: WRBR Maintenace Yard is listed as by appointment access (Government use only) — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the SERO: WRBR Maintenace Yard listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

North Carolina · 2024
Plug-in vehicles
119K
#15 in US
Battery-electric
91K
76% of fleet
EVs per public port
19.5
6,107 ports listed

As of 2024, North Carolina had 119,300 plug-in vehicles registered — 91,000 fully battery-electric (76%) and 28,300 plug-in hybrid (24%). That ranks North Carolina #15 nationally and represents about 2.0% of all US plug-in registrations.

Across 6,107 publicly-listed ports in North Carolina (3,355 Level 2 and 2,737 DC fast), that works out to roughly 19.5 EVs per public port and 33.2 BEVs per DC fast port.

North Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more North Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full North Carolina market data →

More charging in Kill Devil Hills

See all →

RAMADA PLAZA RAMADA PLAZA

Kill Devil Hills, NC

Level 2ChargePoint
1 station · 2 ports6.5 kW

Outer Banks Brewing Station

Kill Devil Hills, NC

Level 2Tesla Destination
1 station · 2 ports16 kW

Kill Devil Hills, NC Supercharger

Kill Devil Hills, NC

DC FastTesla
1 station · 8 ports150 kW
Details
Network
Non-networked
Access
By appointment · Government use only
Workplace charging, mainly for employees · From NREL
Ownership
Federal government
From NREL

Verified by NREL · 9 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id443024
zip27948
cityKill Devil Hills
plus4—
stateNC
ng_psi—
cng_psi—
countryUS
latitude36.0108
bd_blends—
longitude-75.6681
open_date2025-08-05
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSERO: WRBR Maintenace Yard
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFED_GOV
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 16,
  "code": "DOI",
  "name": "Department of the Interior"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address800 Colington Rd
funding_sources—
owner_type_codeFG
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 1
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesNEMA1450
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2025-12-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging