SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNorth CarolinaForest City
NC-690292

DIT Western Data Center

1371 Old Caroleen Rd, Forest City, NC, 28043
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
DIT Western Data Center · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1371 Old Caroleen Rd · Forest City, NC · 28043

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is DIT Western Data Center located?
DIT Western Data Center is located at 1371 Old Caroleen Rd, Forest City, NC.
What kind of charging does DIT Western Data Center offer?
DIT Western Data Center offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at DIT Western Data Center?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at DIT Western Data Center. Actual times vary with vehicle, temperature, and station load.
What are DIT Western Data Center's charging hours?
Open 24 hours
What charging network operates DIT Western Data Center?
DIT Western Data Center is part of the AMPUP network. See more AMPUP charging across NC on SpotCharge.
Can anyone use the chargers at DIT Western Data Center?
DIT Western Data Center is listed as by appointment access — check the details before visiting.
Is the DIT Western Data Center listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

North Carolina · 2024
Plug-in vehicles
119K
#15 in US
Battery-electric
91K
76% of fleet
EVs per public port
21.5
5,560 ports listed

As of 2024, North Carolina had 119,300 plug-in vehicles registered — 91,000 fully battery-electric (76%) and 28,300 plug-in hybrid (24%). That ranks North Carolina #15 nationally and represents about 2.0% of all US plug-in registrations.

Across 5,560 publicly-listed ports in North Carolina (3,058 Level 2 and 2,491 DC fast), that works out to roughly 21.5 EVs per public port and 36.5 BEVs per DC fast port.

North Carolina's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full North Carolina market data →

More charging in Forest City

See all →

McCurry Deck Chevrolet

Forest City, NC

Level 2Non-Networked
1 station · 2 ports7.2 kW

Friendship Nissan

Forest City, NC

Level 2Non-Networked
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Network
AMPUP ↗
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging