SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNorth CarolinaSouthern Pines
NC-461971

S. Bennett St.

153 S. Bennett St. Southern Pines, NC 28387, Southern Pines, NC, 28387

S. Bennett St. is an EV charging location in Southern Pines, NC with 4 Level 2 charging ports up to 19 kW on the ChargeLab network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
19.2 kW
AC Level 2
Ports
4
ports
Hours
—
Pricing
—

Stations & ports

1 station · 4 ports
S. Bennett St. · L2 J1772 19.2 kW
CHARGELAB
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on CHARGELAB network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW
1CJ1772· 19.2 kW
1DJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

153 S. Bennett St. Southern Pines, NC 28387 · Southern Pines, NC · 28387

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is S. Bennett St. located?
S. Bennett St. is located at 153 S. Bennett St. Southern Pines, NC 28387, Southern Pines, NC.
What kind of charging does S. Bennett St. offer?
S. Bennett St. offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at S. Bennett St.?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at S. Bennett St.. Actual times vary with vehicle, temperature, and station load.
What charging network operates S. Bennett St.?
S. Bennett St. is part of the ChargeLab network. See more ChargeLab charging across NC on SpotCharge.
Can anyone use the chargers at S. Bennett St.?
Yes — S. Bennett St. is a publicly accessible charging location.
Is the S. Bennett St. listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

North Carolina · 2024
Plug-in vehicles
119K
#15 in US
Battery-electric
91K
76% of fleet
EVs per public port
19.5
6,107 ports listed

As of 2024, North Carolina had 119,300 plug-in vehicles registered — 91,000 fully battery-electric (76%) and 28,300 plug-in hybrid (24%). That ranks North Carolina #15 nationally and represents about 2.0% of all US plug-in registrations.

Across 6,107 publicly-listed ports in North Carolina (3,355 Level 2 and 2,737 DC fast), that works out to roughly 19.5 EVs per public port and 33.2 BEVs per DC fast port.

North Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more North Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full North Carolina market data →

More charging in Southern Pines

See all →

Ascend Morganton Park

Southern Pines, NC

Level 2Blink
1 station · 2 ports11.5 kW

Lowes Foods - Tesla Supercharger

Southern Pines, NC

DC FastTesla
1 station · 8 ports325 kW

Pinehurst Nissan

Southern Pines, NC

Level 2
1 station · 1 port

National Athletic Village

Southern Pines, NC

Level 2Tesla Destination
1 station · 2 ports16 kW
Details
Phone
800-636-0986
Network
ChargeLab ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id374666
zip28387
citySouthern Pines
plus4—
stateNC
ng_psi—
cng_psi—
countryUS
latitude35.175365
bd_blends—
longitude-79.393774
open_date2024-12-30
rd_blends—
ev_networkCHARGELAB
ev_pricing—
updated_at2026-09-19T04:19:52Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameS. Bennett St.
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone800-636-0986
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "81bdd7ef-ff05-4808-abd1-360cabe9f9ca**1",
    "b8ead90e-762c-4a0f-9b18-2aa6084d231a**1",
    "c654529e-bcb0-4da6-b0dd-a468049249d7**1",
    "cf17f1ea-114e-4a9b-8723-e88edab1f7f0**1"
  ],
  "station": [
    "125-67c0964079f80ff64ddce609"
  ]
}
ev_network_webhttps://chargelab.co
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address153 S. Bennett St. Southern Pines, NC 28387
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num4
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging