SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNorth CarolinaMorganton
NC-333351

MORGANTON, NC FAST CHARGER #4

2128 S Sterling St, Morganton, NC, 28655

MORGANTON, NC FAST CHARGER #4 is an EV charging location in Morganton, NC with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
MORGANTON, NC FAST CHARGER #4 · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
MORGANTON, NC FAST CHARGER #4 · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2128 S Sterling St · Morganton, NC · 28655

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MORGANTON, NC FAST CHARGER #4 located?
MORGANTON, NC FAST CHARGER #4 is located at 2128 S Sterling St, Morganton, NC.
What kind of charging does MORGANTON, NC FAST CHARGER #4 offer?
MORGANTON, NC FAST CHARGER #4 offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at MORGANTON, NC FAST CHARGER #4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at MORGANTON, NC FAST CHARGER #4. Actual times vary with vehicle, temperature, and station load.
What are MORGANTON, NC FAST CHARGER #4's charging hours?
24 hours daily
What charging network operates MORGANTON, NC FAST CHARGER #4?
MORGANTON, NC FAST CHARGER #4 is part of the ChargePoint network. See more ChargePoint charging across NC on SpotCharge.
Can anyone use the chargers at MORGANTON, NC FAST CHARGER #4?
Yes — MORGANTON, NC FAST CHARGER #4 is a publicly accessible charging location.
Is the MORGANTON, NC FAST CHARGER #4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

North Carolina · 2024
Plug-in vehicles
119K
#15 in US
Battery-electric
91K
76% of fleet
EVs per public port
19.5
6,107 ports listed

As of 2024, North Carolina had 119,300 plug-in vehicles registered — 91,000 fully battery-electric (76%) and 28,300 plug-in hybrid (24%). That ranks North Carolina #15 nationally and represents about 2.0% of all US plug-in registrations.

Across 6,107 publicly-listed ports in North Carolina (3,355 Level 2 and 2,737 DC fast), that works out to roughly 19.5 EVs per public port and 33.2 BEVs per DC fast port.

North Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more North Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full North Carolina market data →

More DC fast charging

DC fast charging in Morganton →DC fast charging in North Carolina →ChargePoint in North Carolina →

More charging in Morganton

See all →

Morganton Plaza

Morganton, NC

DC FastBlink
2 stations · 4 ports180 kW

Morganton Honda

Morganton, NC

DC FastBlink
1 station · 1 port30 kW

MORGANTON, NC FAST CHARGER #2

Morganton, NC

DC FastChargePoint
2 stations · 2 ports62.5 kW

MORGANTON, NC CATAWBA MEADOWS

Morganton, NC

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id372747
zip28655
cityMorganton
plus4—
stateNC
ng_psi—
cng_psi—
countryUS
latitude35.725907
bd_blends—
longitude-81.662264
open_date2024-12-11
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:02:06Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMORGANTON, NC FAST CHARGER #4
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "21954851"
  ],
  "station": [
    "USCPIL12701691"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2128 S Sterling St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging