SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNorth CarolinaAsheville
NC-092128

Rivian Adventure

800 Brevard Road, Asheville, NC, 28806

Rivian Adventure is an EV charging location in Asheville, NC with 6 DC fast charging ports on the Rivian Adventure Network network. Charging power is not listed for this location; Rivian Adventure Network sites are typically 200 to 300 kW, which can add 100 miles or more in 15 to 25 minutes, depending on the car. 24/7. Public access. Listing data from OpenStreetMap, last confirmed May 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
—
DC fast
Ports
6
ports
Hours
24/7
24/7
Pricing
—

Stations & ports

1 station · 6 ports
Rivian Adventure · CCS
Rivian Adventure
DC fast

Rating not listed. Rivian Adventure Network sites are typically 200 to 300 kW. That can add 100 miles or more in 15 to 25 minutes, depending on the car.

1ACCS
1BCCS
1CCCS
1DCCS
1ECCS
1FCCS

Estimated charging time

DC fast charging · typical 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

800 Brevard Road · Asheville, NC · 28806

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Rivian Adventure located?
Rivian Adventure is located at 800 Brevard Road, Asheville, NC.
What kind of charging does Rivian Adventure offer?
Rivian Adventure offers DC fast charging. There is 1 charging station and 6 total ports at this location.
How long does it take to charge an EV at Rivian Adventure?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on a typical 50 kW DC fast charging at Rivian Adventure. Actual times vary with vehicle, temperature, and station load.
What are Rivian Adventure's charging hours?
24/7
What charging network operates Rivian Adventure?
Rivian Adventure is part of the Rivian Adventure Network. See more Rivian Adventure Network charging across NC on SpotCharge.
Can anyone use the chargers at Rivian Adventure?
Yes — Rivian Adventure is a publicly accessible charging location.
Is the Rivian Adventure listing owner-managed?
Not yet. This page was generated from open charging data (OpenStreetMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

North Carolina · 2024
Plug-in vehicles
119K
#15 in US
Battery-electric
91K
76% of fleet
EVs per public port
19.5
6,107 ports listed

As of 2024, North Carolina had 119,300 plug-in vehicles registered — 91,000 fully battery-electric (76%) and 28,300 plug-in hybrid (24%). That ranks North Carolina #15 nationally and represents about 2.0% of all US plug-in registrations.

Across 6,107 publicly-listed ports in North Carolina (3,355 Level 2 and 2,737 DC fast), that works out to roughly 19.5 EVs per public port and 33.2 BEVs per DC fast port.

North Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more North Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full North Carolina market data →

More DC fast charging

DC fast charging in Asheville →DC fast charging in North Carolina →Rivian Adventure Network in North Carolina →

More charging in Asheville

See all →

TRU by Hilton Asheville East - Tesla Destination

Asheville, NC

Level 2Tesla Destination
2 stations · 8 ports7 kW

55 S Market St

Asheville, NC

Level 2ChargeLab
1 station · 2 ports19.2 kW

FA SUBARU SERVICE L2 OUT

Asheville, NC

Level 2ChargePoint
1 station · 2 ports6.5 kW

ASH LV3 STATION 1

Asheville, NC

DC FastChargePoint
1 station · 2 ports80 kW
Details
Hours
24/7
Network
Rivian Adventure Network
Access
Public access

Synced from OpenStreetMap · 4 months ago

Data from OpenStreetMap (ODbL)

SpotCharge · Owner-listed EV charging